Quick answers
What is this project?
Diversion of 0.04 Ha of Forest Land for Construction of Mobile Tower for Provision of 4G based mobile services at MHA identified locations in Left Wing Extremism (LWE-II) affected areas falling in Geddapalli, (v) Polavaram (m), in Eluru Forest Division is a lapsed telecom project in Geddapalli, Polavaram, Eluru, Andhra Pradesh. The site covers 0.1 acres.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
No. The application was lapsed on 1 Apr 2026, so it is no longer under consideration.
Where is it?
In Geddapalli, Polavaram, Eluru, Andhra Pradesh.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.1 acres and 400 m² of forest land.
When was it filed?
The application was filed on 3 Oct 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 0.04 Ha of Forest Land for Construction of Mobile Tower for Provision of 4G…
Project details
| Official title | Diversion of 0.04 Ha of Forest Land for Construction of Mobile Tower for Provision of 4G based mobile services at MHA identified locations in Left Wing Extremism (LWE-II) affected areas falling in Geddapalli, (v) Polavaram (m), in Eluru Forest Division in Eluru District. Andhra Pradesh State. |
|---|---|
| Status | Lapsed |
| Status since | 1 Apr 2026 |
| Application filed | 3 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Land area | 400 m² |
| Forest land | 400 m² |
| Project cost | ₹50 lakh |
| Village / locality | Geddapalli |
| Taluk / tehsil | Polavaram |
| District | Eluru |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04795 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Oct 2025 | Under wildlife review | 0.1 acres | ₹50 lakh |
| New project filed 3 Oct 2025 (this page) | Lapsed | 0.1 acres | ₹50 lakh |
In context
5 applications in Eluru since January 2022 are in the same category (Telecom): 2 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Geddapalli, Polavaram, Eluru, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.04 Ha of Forest Land for Construction of Mobile Tower for… — under wildlife review, 0 m away
- Bsnl 4g Saturation Project_chimaluru_eluru_ap — under wildlife review, 1.6 km away
- Bsnl 4g Saturation Project_chimaluru_eluru_ap — more information requested, 1.6 km away
- Bsnl 4g Saturation Project_tangedukonda_eluru_ap — under wildlife review, 1.8 km away
- Bsnl 4g Saturation Project_ginnepalli_eluru_ap — under wildlife review, 2.1 km away
- Bsnl 4g Saturation Project_dharwada_eluru_ap — lapsed, 3.9 km away
- Bsnl 4g Saturation Project_dharwada_eluru_ap — decision issued, 3.9 km away
- Road From Chintapalli to Urrinka of Buttayagudem Mandal — more information requested, 7.5 km away
More from Bharti Airtel Limited in Eluru
- Laying underground OFC along the roads between "Koyyalgudem-Kannapuram-Gogumill… — more information requested
- Laying underground OFC along the roads between "Koyyalgudem-Kannapuram-Gogumill… — forest land use approved
4 Bharti Airtel (Airtel) projects in Eluru
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.