Quick answers
What is Bsnl 4g Saturation Project_chimaluru_eluru_ap?
Bsnl 4g Saturation Project_chimaluru_eluru_ap is a proposed project in Geddapalli, Polavaram, Eluru, Andhra Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Geddapalli, Polavaram, Eluru, Andhra Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 0 acres.
When was it filed?
The application was filed on 4 Jun 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 4 Jun 2026 |
| Application filed | 4 Jun 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Geddapalli |
| Taluk / tehsil | Polavaram |
| District | Eluru |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05101 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Jun 2026 (this page) | More information requested | 0 acres | ₹1 crore |
| New project filed 4 Jun 2026 | Under wildlife review | 0 acres | ₹1 crore |
In context
15 applications in Eluru since January 2022 are in the same category (Other): 0 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Geddapalli, Polavaram, Eluru, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project_chimaluru_eluru_ap — under wildlife review, 0 m away
- Diversion of 0.04 Ha of Forest Land for Construction of Mobile Tower for… — under wildlife review, 1.6 km away
- Diversion of 0.04 Ha of Forest Land for Construction of Mobile Tower for… — lapsed, 1.6 km away
- Bsnl 4g Saturation Project_tangedukonda_eluru_ap — under wildlife review, 1.8 km away
- Bsnl 4g Saturation Project_ginnepalli_eluru_ap — under wildlife review, 3.7 km away
- Bsnl 4g Saturation Project_dharwada_eluru_ap — lapsed, 4.8 km away
- Bsnl 4g Saturation Project_dharwada_eluru_ap — decision issued, 4.8 km away
- Bsnl 4g Saturation Project_udathapalli_eluru_ap — lapsed, 8.7 km away
More from Mahesh Nair in Eluru
- Bsnl 4g Saturation Project_ginnepalli_eluru_ap — under wildlife review
- Bsnl 4g Saturation Project_tangedukonda_eluru_ap — under wildlife review
- Bsnl 4g Saturation Project_modela_eluru_ap — under wildlife review
- Bsnl 4g Saturation Project_methapukota_eluru_ap — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.