Quick answers
What is Road from LND Peta to Gummuluru of Buttayagudem mandal?
Road from LND Peta to Gummuluru of Buttayagudem mandal is a proposed road project in Gummaluru, Buttayagudem, Eluru, Andhra Pradesh. The site covers 10.7 acres.
Who is building it?
The applicant is Executive Engineer, PR Division, Janagreddygudem.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Gummaluru, Buttayagudem, Eluru, Andhra Pradesh.
How big is it?
It has a stated cost of ₹4.1 crore; a site of 10.7 acres and 7.1 acres (2.9 ha) of forest land.
When was it filed?
The application was filed on 22 Sept 2026.
Project details
| Official title | Road from LND Peta to Gummuluru of Buttayagudem mandal in Eluru district |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 23 Nov 2026 |
| Application filed | 22 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer, PR Division, Janagreddygudem |
| Land area | 10.7 acres (4.4 ha) |
| Forest land | 7.1 acres (2.9 ha) |
| Project cost | ₹4.1 crore |
| Village / locality | Gummaluru |
| Taluk / tehsil | Buttayagudem |
| District | Eluru |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04875 |
In context
10 applications in Eluru since January 2022 are in the same category (Roads & highways): 0 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. At 10.7 acres, this one is larger than 80% of them.
Where it is
Gummaluru, Buttayagudem, Eluru, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road from KP Road to Veerannapalem — in-principle approval, conditions pending, 5.3 km away
- Sri Manapati Abbulu — environmental approval granted, 8.3 km away
- Laying underground OFC along the roads between "Koyyalgudem-Kannapuram-Gogumill… — more information requested, 9.6 km away
- Laying underground OFC along the roads between "Koyyalgudem-Kannapuram-Gogumill… — forest land use approved, 9.6 km away
- Chintalapudi Lift Irrigation Scheme — cleared for impact study, 10.8 km away
- Chintalapudi Lift Irrigation Scheme — under environmental review, 10.8 km away
- Bsnl 4g Saturation Project_udathapalli_eluru_ap — lapsed, 11 km away
- Bsnl 4g Saturation Project_udathapalli_eluru_ap — decision issued, 11 km away
More from Executive Engineer, PR Division, Janagreddygudem in Eluru
- Road from KP Road to Veerannapalem — in-principle approval, conditions pending
- Road From Chintapalli to Urrinka of Buttayagudem Mandal — more information requested
- Road from Gurugumilli to Puchiokagondi via Chintakonda, Gottalarevu — in-principle approval, conditions pending
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.