Quick answers
What is Road from KP Road to Veerannapalem?
Road from KP Road to Veerannapalem is a proposed road project in Virannapalem, Buttayagudem, Eluru, Andhra Pradesh. The site covers 7.5 acres.
Who is building it?
The applicant is Executive Engineer, PR Division, Janagreddygudem.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Virannapalem, Buttayagudem, Eluru, Andhra Pradesh.
How big is it?
It has a stated cost of ₹4.8 crore; a site of 7.5 acres and 4.9 acres (2 ha) of forest land.
When was it filed?
The application was filed on 22 Sept 2026.
Project details
| Official title | Road from KP Road to Veerannapalem in Buttayagudem Mandal of Eluru District |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 26 Nov 2026 |
| Application filed | 22 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer, PR Division, Janagreddygudem |
| Land area | 7.5 acres (3 ha) |
| Forest land | 4.9 acres (2 ha) |
| Project cost | ₹4.8 crore |
| Village / locality | Virannapalem |
| Taluk / tehsil | Buttayagudem |
| District | Eluru |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04994 |
In context
10 applications in Eluru since January 2022 are in the same category (Roads & highways): 0 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. At 7.5 acres, this one is larger than 50% of them.
Where it is
Virannapalem, Buttayagudem, Eluru, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying underground OFC along the roads between "Koyyalgudem-Kannapuram-Gogumill… — more information requested, 5.3 km away
- Laying underground OFC along the roads between "Koyyalgudem-Kannapuram-Gogumill… — forest land use approved, 5.3 km away
- Road from LND Peta to Gummuluru of Buttayagudem mandal — in-principle approval, conditions pending, 5.3 km away
- Road From Chintapalli to Urrinka of Buttayagudem Mandal — more information requested, 7.3 km away
- Bsnl 4g Saturation Project_ginnepalli_eluru_ap — under wildlife review, 11 km away
- Bsnl 4g Saturation Project_udathapalli_eluru_ap — lapsed, 12.1 km away
- Bsnl 4g Saturation Project_udathapalli_eluru_ap — decision issued, 12.1 km away
- Bsnl 4g Saturation Project_tangedukonda_eluru_ap — under wildlife review, 12.7 km away
More from Executive Engineer, PR Division, Janagreddygudem in Eluru
- Road From Chintapalli to Urrinka of Buttayagudem Mandal — more information requested
- Road from LND Peta to Gummuluru of Buttayagudem mandal — in-principle approval, conditions pending
- Road from Gurugumilli to Puchiokagondi via Chintakonda, Gottalarevu — in-principle approval, conditions pending
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.