Quick answers
What is this project?
Diversion of 33.11 Ha. of Forest Land for Quarry Lease for Extraction of Quartz Mineral in Compt. No. 556 of Sr Puram Rf and Compt.No. 637 of Sr Puram Extn. Rf of Udayagiri Range, Nellore Division X is a lapsed mining project in Seetharamapuram, Nellore, Andhra Pradesh. The site covers 81.8 acres.
Who is building it?
The applicant is Manoj Kumar Reddy Pothireddy.
Has it been approved?
No. The application was lapsed on 6 Feb 2026, so it is no longer under consideration.
Where is it?
In Seetharamapuram, Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹95 lakh; a site of 81.8 acres and 81.8 acres (33.1 ha) of forest land.
When was it filed?
The application was filed on 25 Dec 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 6 Feb 2026 |
| Application filed | 25 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Manoj Kumar Reddy Pothireddy |
| Land area | 81.8 acres (33.1 ha) |
| Forest land | 81.8 acres (33.1 ha) |
| Project cost | ₹95 lakh |
| Village / locality | Seetharamapuram |
| Taluk / tehsil | Seetharamapuram |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04893 |
In context
232 applications in Nellore since January 2022 are in the same category (Mining): 150 approved, 25 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 81.8 acres, this one is larger than 97% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Seetharamapuram, Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s SGS Minerals Pvt Ltd — environmental approval granted, 10.7 km away
- 1.210 Ha. of Road Metal, Gravel & Morrum Mine of M/s RK-MRGR (JV),Sy.No.01 of… — environmental approval granted, 19.4 km away
- 0.990 Ha. of Road Metal, Gravel & Morrum Mine of M/s RK-MRGR (JV), No. 01 of… — environmental approval granted, 19.8 km away
- M/s. Indosol Solar Private Limited - Quartz mine - 32.777 ha — environmental approval granted, 28.6 km away
- M/s. Indosol Solar Private Limited - Quartz mine - 32.777 ha — cleared for impact study, 28.6 km away
- Sri P Guravaiah — under environmental review, 29.6 km away
- Diversion of 2.09 Ha in Nellore Division for formation of BT road from Km.3/2… — lapsed, 32 km away
- Quartz Mine Over an Extent of 15.375 Ha — cleared for impact study, 33.7 km away
More from Manoj Kumar Reddy Pothireddy in Sri Potti Sriramulu Nellore
- Industrial Buildings to establish Solar Modules Manufacturing Facility with… — environmental approval granted
- EC application for Construction of Industrial Buildings to establish Solar… — environmental approval granted
- Diversion of 5.55 ha of forest land for laying of 33kV Double Circuit… — forest land use approved
- Industrial Buildings to establish Solar Modules Manufacturing Facility with… — cleared for impact study
- Environmental Impact Assessment study for obtaining CRZ clearance for… — coastal clearance granted
- Diversion of 0.99 ha of forest land for laying of 33kV Double Circuit line in… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.