Quick answers
What is this project?
Industrial Buildings to establish Solar Modules Manufacturing Facility with Annual Capacity of 10 GW is a proposed industrial building project in Karedu, Ulavapadu, Nellore, Andhra Pradesh. The site covers 842.4 acres.
Who is building it?
The applicant is Manoj Kumar Reddy Pothireddy.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 6 Feb 2026), as of 27 Nov 2026.
Where is it?
In Karedu, Ulavapadu, Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹18,000 crore and a site of 842.4 acres.
When was it filed?
The application was filed on 4 Dec 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Industrial Buildings to establish Solar Modules Manufacturing Facility with Annual…
Project details
| Official title | Proposed Construction of Industrial Buildings to establish Solar Modules Manufacturing Facility with Annual Capacity of 10 GW at Karedu Village, Ulavapadu Mandal, SPSR Nellore District, Andhra Pradesh by M/s. INDOSOL SOLAR PRIVATE LIMITED (ISPL) |
|---|---|
| Status | Cleared for impact study |
| Status since | 6 Feb 2026 |
| Application filed | 4 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Manoj Kumar Reddy Pothireddy |
| Use | Industrial |
| Land area | 842.4 acres (340.9 ha) |
| Built-up area | 12,31,064 m² (1,32,51,050 sq ft) |
| Plot area | 34,09,000 m² (3,66,94,135 sq ft) |
| Project cost | ₹18,000 crore |
| Village / locality | Karedu |
| Taluk / tehsil | Ulavapadu |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02975 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Jun 2026 | Environmental approval granted | 842.4 acres | ₹18,000 crore |
| Early planning filed 4 Dec 2025 (this page) | Cleared for impact study | 842.4 acres | ₹18,000 crore |
In context
11 applications in Nellore since January 2022 are in the same category (Buildings & townships): 8 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 842.4 acres, this one is larger than 73% of them.
Where it is
Karedu, Ulavapadu, Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial Buildings to establish Solar Modules Manufacturing Facility with… — environmental approval granted, 0 m away
- Manufacture of Single Super Phosphate (SSP) Fertilizer — environmental approval granted, 5.6 km away
- Manufacture of Single Super Phosphate (SSP) Fertilizer — cleared for impact study, 5.6 km away
- De-Casting of Sand in Patta Land of Smt.K.Bujjamma — environmental approval granted, 13 km away
- Diversion of 13.65 Ha. of forest land in Compt. No. 393 of Ravuru RF, Mocherla… — forest land use approved, 13.1 km away
- Diversion of 5.55 ha of forest land for laying of 33kV Double Circuit… — forest land use approved, 13.2 km away
- Diversion of 0.99 ha of forest land for laying of 33kV Double Circuit line in… — lapsed, 13.5 km away
- Greenfield Non-Major Port at Ramayapatnam — environmental approval granted, 15.5 km away
More from Manoj Kumar Reddy Pothireddy in Sri Potti Sriramulu Nellore
- EC application for Construction of Industrial Buildings to establish Solar… — environmental approval granted
- Diversion of 5.55 ha of forest land for laying of 33kV Double Circuit… — forest land use approved
- Diversion of 33.11 Ha. of Forest Land for Quarry Lease for Extraction of… — lapsed
- Environmental Impact Assessment study for obtaining CRZ clearance for… — coastal clearance granted
- Diversion of 0.99 ha of forest land for laying of 33kV Double Circuit line in… — lapsed
- Environmental Impact Assessment Study Related to Crz Clearance for Setting Up… — withdrawn
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.