Quick answers
What is this project?
Environmental Impact Assessment study for obtaining CRZ clearance for releasing 6 MLD treated effluent in sea of Indosol Solar Private Limited at Ramayapatnam, Andhra Pradesh is an approved power project in Na, Gudluru, Nellore, Andhra Pradesh. The site covers 0.2 acres.
Who is building it?
The applicant is Manoj Kumar Reddy Pothireddy.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 12 Dec 2025), as of 27 Nov 2026.
Where is it?
In Na, Gudluru, Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹6 crore and a site of 0.2 acres.
When was it filed?
The application was filed on 15 Oct 2025.
Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 12 Dec 2025 |
| Application filed | 15 Oct 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Power |
| Applicant | Manoj Kumar Reddy Pothireddy |
| Land area | 800 m² |
| Project cost | ₹6 crore |
| Village / locality | Na |
| Taluk / tehsil | Gudluru |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05223 |
In context
7 applications in Nellore since January 2022 are in the same category (Power): 4 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Na, Gudluru, Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Ramayapatnam Greenfield Port Development in Andhra Pradesh (4 km away); BPCL Plans 9 MMTPA Greenfield Refinery and Petrochemical Complex in Andhra Pradesh (4 km away).
Other projects nearby
- Environmental Impact Assessment Study Related to Crz Clearance for Setting Up… — withdrawn, 150 m away
- 9 MMTPA Greenfield Refinery and Petrochemical Complex by BPCL — environmental approval granted, 4 km away
- 9 MMTPA Greenfield Refinery and Petrochemical Complex by BPCL — cleared for impact study, 4 km away
- 9 MMTPA Greenfield Refinery and Petrochemical Complex by BPCL — lapsed, 4 km away
- 9 MMTPA Greenfield Refinery and Petrochemical Complex by BPCL — cleared for impact study, 4 km away
- Fish Landing Centre At Murthumpeta, SPSR Nellore District, Andhra Pradesh — recommended by coastal authority, 6.1 km away
- Greenfield Non-Major Port at Ramayapatnam — environmental approval granted, 6.4 km away
- EC application for Construction of Industrial Buildings to establish Solar… — environmental approval granted, 6.5 km away
More from Manoj Kumar Reddy Pothireddy in Sri Potti Sriramulu Nellore
- Industrial Buildings to establish Solar Modules Manufacturing Facility with… — environmental approval granted
- EC application for Construction of Industrial Buildings to establish Solar… — environmental approval granted
- Diversion of 5.55 ha of forest land for laying of 33kV Double Circuit… — forest land use approved
- Diversion of 33.11 Ha. of Forest Land for Quarry Lease for Extraction of… — lapsed
- Industrial Buildings to establish Solar Modules Manufacturing Facility with… — cleared for impact study
- Diversion of 0.99 ha of forest land for laying of 33kV Double Circuit line in… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.