Quick answers
What is this project?
CRZ Clearance for Autonomous Maritime Shipyard and Systems Development Centre at Juvvaladinne Fishing Harbour, Bogole Mandal, Sri Potti Sriramulu Nellore District, Andhra Pradesh is a proposed port and coastal project in Juvvaladinne, Bogole, Nellore, Andhra Pradesh. The site covers 29.6 acres.
Who is building it?
The applicant is Sagar Defence Engineering Limited.
Has it been approved?
Yes. Its status is “Recommended by coastal authority” (since 23 Nov 2026), as of 27 Nov 2026.
Where is it?
In Juvvaladinne, Bogole, Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹65 crore and a site of 29.6 acres.
When was it filed?
The application was filed on 20 Sept 2026.
Project details
| Status | Recommended by coastal authority |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 20 Sept 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Sagar Defence Engineering Limited |
| Land area | 29.6 acres (12 ha) |
| Project cost | ₹65 crore |
| Village / locality | Juvvaladinne |
| Taluk / tehsil | Bogole |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05147 |
Where it is
Juvvaladinne, Bogole, Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Critical Mineral Assessment Programme in Konda Bitragunta, Andhra Pradesh (12.8 km away).
Other projects nearby
- Transfer of Environmental Clearance issued for quarry lease at Gowravaram (V),… — environmental approval granted, 11.8 km away
- Critical Mineral Assessment Programme for assessing the potentiality of… — initial checks, 12.8 km away
- 2D seismic data acquisition in Sector-3B (Krishna Godavari), under Mission… — lapsed, 13 km away
- 2D seismic data acquisition in Sector-3B (Krishna Godavari), under Mission… — forest land use approved, 13 km away
- Green field 2 x 100 KLPD Grain based Ethanol Plant with 2 x 2.4 MW… — environmental approval granted, 17.2 km away
- Transfer of Environmental clearance (EC) from M/s Bhogapuram International… — lapsed, 18.6 km away
- Mining of Gravel Quarry, M/s Om Sri Sai Srinivasa Minerals, Mg. Pt: Sri I.… — environmental approval granted, 19 km away
- Sri E. Suresh — environmental approval granted, 19.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.