Quick answers
What is Attunli Hydroelectric Project (680 MW)?
Attunli Hydroelectric Project (680 MW) is a proposed water and irrigation project in Athunli, Etalin, Upper Dibang Valley, Arunachal Pradesh. The site covers 166.2 acres.
Who is building it?
The applicant is SJVN Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 5 Mar 2024), as of 27 Nov 2026.
Where is it?
In Athunli, Etalin, Upper Dibang Valley, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹5,896 crore and a site of 166.2 acres.
When was it filed?
The application was filed on 11 Jan 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Attunli Hydroelectric Project (680 MW)
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 5 Mar 2024 |
| Application filed | 11 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | SJVN Limited |
| Land area | 166.2 acres (67.3 ha) |
| Project cost | ₹5,896 crore |
| Village / locality | Athunli |
| Taluk / tehsil | Etalin |
| District | Upper Dibang Valley |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00004 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Jun 2026 | Environmental approval granted | 166.2 acres | ₹5,896 crore |
| Early planning filed 11 Jan 2024 (this page) | Cleared for impact study | 166.2 acres | ₹5,896 crore |
In context
9 applications in Upper Dibang Valley since January 2022 are in the same category (Water & irrigation): 6 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Athunli, Etalin, Upper Dibang Valley, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Attunli Hydroelectric Project (680 MW) — environmental approval granted, 0 m away
- Attunli Hydro Electric Project — in-principle approval, conditions pending, 0 m away
- Diversion of 0.6 Hact. of Forest Land for Construction of New Staging Camp… — decision issued, 12.1 km away
- Forest Clearance — lapsed, 12.7 km away
- Etalin Hydro Electric Project — in-principle approval, conditions pending, 20.3 km away
- Etalin HEP 3097 MW — environmental approval granted, 20.3 km away
- Environment Clearance of Etalin HEP 3097 MW — environmental approval granted, 20.3 km away
- Environment Clearance of Etalin HEP 3097 MW — environmental approval granted, 20.3 km away
More from SJVN Limited in Upper Dibang Valley
- Etalin Hydro Electric Project — in-principle approval, conditions pending
- Environment Clearance of Etalin HEP 3097 MW — environmental approval granted
- Environment Clearance of Etalin HEP 3097 MW — environmental approval granted
- Attunli Hydro Electric Project — in-principle approval, conditions pending
- Etalin Hydro Electric Project — more information requested
7 Sjvn projects in Upper Dibang Valley
All 17 Sjvn projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.