What is Attunli Hydro Electric Project?
Attunli Hydro Electric Project is a proposed water and irrigation project in Sunil, Etalin, Upper Dibang Valley, Arunachal Pradesh. The site covers 166.2 acres.
Who is building it?
The applicant is Sjvn Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Sunil, Etalin, Upper Dibang Valley, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹6,267.8 crore; a site of 166.2 acres and 646.3 acres (261.5 ha) of forest land.
When was it filed?
The application was filed on 27 Feb 2024.
Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 9 Jun 2026 |
| Application filed | 27 Feb 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Sjvn Limited |
| Land area | 166.2 acres (67.3 ha) |
| Forest land | 646.3 acres (261.5 ha) |
| Project cost | ₹6,267.8 crore |
| Village / locality | Sunil |
| Taluk / tehsil | Etalin |
| District | Upper Dibang Valley |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00107 |
In context
9 applications in Upper Dibang Valley since January 2022 are in the same category (Water & irrigation): 6 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sunil, Etalin, Upper Dibang Valley, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Attunli Hydroelectric Project (680 MW) — environmental approval granted, 0 m away
- Attunli Hydroelectric Project (680 MW) — cleared for impact study, 0 m away
- Diversion of 0.6 Hact. of Forest Land for Construction of New Staging Camp… — decision issued, 12.1 km away
- Forest Clearance — lapsed, 12.7 km away
- Etalin Hydro Electric Project — in-principle approval, conditions pending, 20.3 km away
- Etalin HEP 3097 MW — environmental approval granted, 20.3 km away
- Environment Clearance of Etalin HEP 3097 MW — environmental approval granted, 20.3 km away
- Environment Clearance of Etalin HEP 3097 MW — environmental approval granted, 20.3 km away
More from Sjvn Limited in Upper Dibang Valley
- Attunli Hydroelectric Project (680 MW) — environmental approval granted
- Etalin Hydro Electric Project — in-principle approval, conditions pending
- Environment Clearance of Etalin HEP 3097 MW — environmental approval granted
- Environment Clearance of Etalin HEP 3097 MW — environmental approval granted
- Etalin Hydro Electric Project — more information requested
- Attunli Hydroelectric Project (680 MW) — cleared for impact study
7 Sjvn projects in Upper Dibang Valley
All 17 Sjvn projects across India
About this information