Quick answers
What is Emra-II Hydro Electric Project?
Emra-II Hydro Electric Project is a proposed water and irrigation project in 11 K.M. Point, Anelih, Upper Dibang Valley, Arunachal Pradesh. The site covers 155.6 acres.
Who is building it?
The applicant is Athena Emra Power Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 2 Nov 2023), as of 27 Nov 2026.
Where is it?
In 11 K.M. Point, Anelih, Upper Dibang Valley, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹3,656.6 crore and a site of 155.6 acres.
When was it filed?
The application was filed on 9 Aug 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 2 Nov 2023 |
| Application filed | 9 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Athena Emra Power Private Limited |
| Land area | 155.6 acres (63 ha) |
| Project cost | ₹3,656.6 crore |
| Village / locality | 11 K.M. Point |
| Taluk / tehsil | Anelih |
| District | Upper Dibang Valley |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00005 |
In context
9 applications in Upper Dibang Valley since January 2022 are in the same category (Water & irrigation): 6 approved, 3 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
Where it is
11 K.M. Point, Anelih, Upper Dibang Valley, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Exploration at ENDOLIN-iSHOLIN GRAPHITE BLOCK in Upper Dibang Valley of… — initial checks, 8.8 km away
- Etalin Hydro Electric Project — in-principle approval, conditions pending, 10.6 km away
- Etalin HEP 3097 MW — environmental approval granted, 10.6 km away
- Environment Clearance of Etalin HEP 3097 MW — environmental approval granted, 10.6 km away
- Environment Clearance of Etalin HEP 3097 MW — environmental approval granted, 10.6 km away
- Etalin Hydro Electric Project — more information requested, 10.6 km away
- 132kV S/c on D/c Tower from Roing to Anini — lapsed, 12 km away
- Attunli Hydroelectric Project (680 MW) — environmental approval granted, 29.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.