Quick answers
What is this project?
Exploration at ENDOLIN-iSHOLIN GRAPHITE BLOCK in Upper Dibang Valley of Arunachal Pradesh is a proposed survey and exploration project in Ithungo (17 K.M. Point), Anelih, Upper Dibang Valley, Arunachal Pradesh. The site covers 1,243.3 acres.
Who is building it?
The applicant is Mamco Mining Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Ithungo (17 K.M. Point), Anelih, Upper Dibang Valley, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹14.5 crore and a site of 1,243.3 acres.
When was it filed?
The application was filed on 23 Oct 2025.
Project details
| Official title | Proposal for Exploration at ENDOLIN-iSHOLIN GRAPHITE BLOCK in Upper Dibang Valley of Arunachal Pradesh |
|---|---|
| Status | Initial checks |
| Status since | 24 Oct 2025 |
| Application filed | 23 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Survey & exploration |
| Applicant | Mamco Mining Private Limited |
| Land area | 1,243.3 acres (503.2 ha) |
| Project cost | ₹14.5 crore |
| Village / locality | Ithungo (17 K.M. Point) |
| Taluk / tehsil | Anelih |
| District | Upper Dibang Valley |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00114 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ithungo (17 K.M. Point), Anelih, Upper Dibang Valley, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 132kV S/c on D/c Tower from Roing to Anini — lapsed, 3.3 km away
- Emra-II Hydro Electric Project — cleared for impact study, 8.8 km away
- Etalin Hydro Electric Project — in-principle approval, conditions pending, 17.1 km away
- Etalin HEP 3097 MW — environmental approval granted, 17.1 km away
- Environment Clearance of Etalin HEP 3097 MW — environmental approval granted, 17.1 km away
- Environment Clearance of Etalin HEP 3097 MW — environmental approval granted, 17.1 km away
- Etalin Hydro Electric Project — more information requested, 17.1 km away
- Attunli Hydroelectric Project (680 MW) — environmental approval granted, 31.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.