Quick answers
What is 132kV S/c on D/c Tower from Roing to Anini?
132kV S/c on D/c Tower from Roing to Anini is a lapsed power project in 11 K.M. Point, Anelih, Upper Dibang Valley, Arunachal Pradesh. The site covers 1,442.8 acres.
Who is building it?
The applicant is Taduram Darang.
Has it been approved?
No. The application was lapsed on 16 Oct 2023, so it is no longer under consideration.
Where is it?
In 11 K.M. Point, Anelih, Upper Dibang Valley, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹3,199.5 crore; a site of 1,442.8 acres and 475.6 acres (192.5 ha) of forest land.
When was it filed?
The application was filed on 5 Jun 2023.
Project details
| Official title | Construction of 132kV S/c on D/c Tower from Roing to Anini under Comprehensive Scheme for Strengthening of Transmission & Distribution System in Arunachal Pradesh. |
|---|---|
| Status | Lapsed |
| Status since | 16 Oct 2023 |
| Application filed | 5 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Taduram Darang |
| Land area | 1,442.8 acres (583.9 ha) |
| Forest land | 475.6 acres (192.5 ha) |
| Project cost | ₹3,199.5 crore |
| Village / locality | 11 K.M. Point |
| Taluk / tehsil | Anelih |
| District | Upper Dibang Valley |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00214 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
11 K.M. Point, Anelih, Upper Dibang Valley, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Exploration at ENDOLIN-iSHOLIN GRAPHITE BLOCK in Upper Dibang Valley of… — initial checks, 3.3 km away
- Emra-II Hydro Electric Project — cleared for impact study, 12 km away
- Etalin Hydro Electric Project — in-principle approval, conditions pending, 20.4 km away
- Etalin HEP 3097 MW — environmental approval granted, 20.4 km away
- Environment Clearance of Etalin HEP 3097 MW — environmental approval granted, 20.4 km away
- Environment Clearance of Etalin HEP 3097 MW — environmental approval granted, 20.4 km away
- Etalin Hydro Electric Project — more information requested, 20.4 km away
- Attunli Hydroelectric Project (680 MW) — environmental approval granted, 34.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.