Quick answers
What is this project?
Diversion of 0.0916 Ha of Forest Land for Establishment of Iocl Petrol Pump at Chimpu is a proposed fuel station in Hollongi Karbi, Itanagar Eac, Papum Pare, Arunachal Pradesh. The site covers 0.2 acres.
Who is building it?
The applicant is Tadar Yaming.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Hollongi Karbi, Itanagar Eac, Papum Pare, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹78 lakh; a site of 0.2 acres and 920 m² of forest land.
When was it filed?
The application was filed on 31 Mar 2025.
Project details
| Official title | Proposal for Diversion of 0.0916 Ha of Forest Land for Establishment of Iocl Petrol Pump at Chimpu in Papum Pare District of Arunachal Pradesh |
|---|---|
| Status | More information requested |
| Status since | 2 Jul 2026 |
| Application filed | 31 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Tadar Yaming |
| Land area | 900 m² |
| Forest land | 920 m² |
| Project cost | ₹78 lakh |
| Village / locality | Hollongi Karbi |
| Taluk / tehsil | Itanagar Eac |
| District | Papum Pare |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00051 |
In context
12 applications in Papum Pare since January 2022 are in the same category (Fuel stations): 3 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 92% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hollongi Karbi, Itanagar Eac, Papum Pare, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0916 ha of forest lend for Establishment of Hindustan Petroleum… — under wildlife review, 0 m away
- Diversion of 0.0916 ha of forest lend for Establishment of Hindustan Petroleum… — in-principle approval, conditions pending, 0 m away
- Diversion of forest land measuring 0.80 Ha for construction of RT Station for… — under wildlife review, 200 m away
- Diversion of forest land measuring 0.80 Ha for construction of RT Station for… — more information requested, 200 m away
- Diversion of forest land measuring 0.80 Ha for construction of RT Station for… — forest land use approved, 200 m away
- Diversion of 0.0013 Ha of Forest Land for Establishment of Petrol Pump at… — lapsed, 450 m away
- 50 TPD Scientific Waste Disposal Facility — under environmental review, 1.7 km away
- Diversion of forest land measuring 0.3728 Ha for construction of RT-02 Station… — withdrawn, 2.5 km away
More from Tadar Yaming in Papum Pare
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.