Quick answers
What is 50 TPD Scientific Waste Disposal Facility?
50 TPD Scientific Waste Disposal Facility is a proposed waste management project in Chakma - V, Balijan Adc, Papum Pare, Arunachal Pradesh. The site covers 2.3 acres.
Who is building it?
The applicant is Itanagar Municipal Corporation.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Chakma - V, Balijan Adc, Papum Pare, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹37.8 crore and a site of 2.3 acres.
When was it filed?
The application was filed on 29 Jun 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 18 Jul 2026 |
| Application filed | 29 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Waste management |
| Applicant | Itanagar Municipal Corporation |
| Land area | 2.3 acres (1 ha) |
| Project cost | ₹37.8 crore |
| Village / locality | Chakma - V |
| Taluk / tehsil | Balijan Adc |
| District | Papum Pare |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00041 |
In context
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chakma - V, Balijan Adc, Papum Pare, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of forest land measuring 0.3728 Ha for construction of RT-02 Station… — withdrawn, 900 m away
- Diversion of forest land measuring 0.3728 Ha for construction of RT-02 Station… — lapsed, 900 m away
- Diversion of 0.0916 ha of forest lend for Establishment of Hindustan Petroleum… — under wildlife review, 1.7 km away
- Diversion of 0.0916 ha of forest lend for Establishment of Hindustan Petroleum… — in-principle approval, conditions pending, 1.7 km away
- Diversion of 0.0916 Ha of Forest Land for Establishment of Iocl Petrol Pump at… — more information requested, 1.7 km away
- Diversion of forest land measuring 0.80 Ha for construction of RT Station for… — under wildlife review, 1.8 km away
- Diversion of forest land measuring 0.80 Ha for construction of RT Station for… — more information requested, 1.8 km away
- Diversion of forest land measuring 0.80 Ha for construction of RT Station for… — forest land use approved, 1.8 km away
More from Itanagar Municipal Corporation in Papum Pare
- C/o SWM Plant at Dapo Yarlo, Itanagar — initial checks
- C/o SWM Plant at Dapo Yarlo, Itanagar — lapsed
- Construction of Solid Waste Management Plant at Karsingsa — initial checks
- Construction of Solid Waste Management Plant at Karsingsa — not approved
All 5 Itanagar Municipal Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.