Diversion of forest land measuring 0.80 Ha for construction of RT Station for Gohpur – Itanagar Pipeline Project

Diversion of forest land measuring 0.80 Ha for construction of RT Station for Gohpur – Itanagar Pipeline Project is an approved pipeline project in Chakma - Ix, Banderdawa, Papum Pare, Arunachal Pradesh. The site covers 2 acres. Its stated project cost is ₹6 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 17 Sept 2024).

See it on the live map All projects in Papum Pare

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of forest land measuring 0.80 Ha for construction of RT Station for Gohpur – Itanagar Pipeline Project is an approved pipeline project in Chakma - Ix, Banderdawa, Papum Pare, Arunachal Pradesh. The site covers 2 acres.

Who is building it?

The applicant is Indradhanush Gas Grid Limited.

Has it been approved?

Yes. Its status is “Forest land use approved” (since 17 Sept 2024), as of 27 Nov 2026.

Where is it?

In Chakma - Ix, Banderdawa, Papum Pare, Arunachal Pradesh.

How big is it?

It has a stated cost of ₹6 crore; a site of 2 acres and 2 acres (0.8 ha) of forest land.

When was it filed?

The application was filed on 18 Sept 2023.

Project details

Official titleProposal for Diversion of forest land measuring 0.80 Ha for construction of RT Station for Gohpur – Itanagar Pipeline Project
StatusForest land use approved
Status since17 Sept 2024
Application filed18 Sept 2023
Approval soughtForest land use
Application typeNew project
SectorPipelines
ApplicantIndradhanush Gas Grid Limited
Land area2 acres (0.8 ha)
Forest land2 acres (0.8 ha)
Project cost₹6 crore
Village / localityChakma - Ix
Taluk / tehsilBanderdawa
DistrictPapum Pare
StateArunachal Pradesh
Location fromSite boundary on record
Our referenceWID-AR-00216

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 11 Dec 2023Under wildlife review2 acres₹6 crore
New project filed 27 Nov 2023More information requested2 acres₹6 crore
New project filed 18 Sept 2023 (this page)Forest land use approved2 acres₹6 crore

In context

6 applications in Papum Pare since January 2022 are in the same category (Pipelines): 2 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.

14 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chakma - Ix, Banderdawa, Papum Pare, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indradhanush Gas Grid Limited in Papum Pare

6 Indradhanush Gas Grid projects in Papum Pare
All 39 Indradhanush Gas Grid projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.