Quick answers
What is 132 kV S/C (on D/C Tower) Kimi-Khuppi Transmission Line?
132 kV S/C (on D/C Tower) Kimi-Khuppi Transmission Line is a proposed power project in Kimi Village, Jamiri Circle, West Kameng, Arunachal Pradesh. The site covers 280 acres.
Who is building it?
The applicant is Department of Power Government of Arunachal Pradesh.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kimi Village, Jamiri Circle, West Kameng, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹58.8 crore; a site of 280 acres and 50.3 acres (20.4 ha) of forest land.
When was it filed?
The application was filed on 12 Dec 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 24 Aug 2026 |
| Application filed | 12 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Department of Power Government of Arunachal Pradesh |
| Land area | 280 acres (113.3 ha) |
| Forest land | 50.3 acres (20.4 ha) |
| Project cost | ₹58.8 crore |
| Village / locality | Kimi Village |
| Taluk / tehsil | Jamiri Circle |
| District | West Kameng |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00092 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Dec 2025 (this page) | More information requested | 280 acres | ₹58.8 crore |
| New project filed 12 Dec 2025 | Under wildlife review | 167.3 acres | ₹58.8 crore |
Where it is
Kimi Village, Jamiri Circle, West Kameng, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 132 kV S/C (on D/C Tower) Kimi-Khuppi Transmission Line — under wildlife review, 0 m away
- Mining of Dolomite Mineral for Dedza Dolomite Deposit — under forest review, 13.8 km away
- Mining of Dolomite Mineral for Dedza Dolomite Deposit — lapsed, 13.8 km away
- Mining of Dolomite mineral for Dedza Dolomite deposit in proposed Dedza mines,… — cleared for impact study, 13.8 km away
- Mining of Minor Mineral (Dolomite) in Dedza Area, District- West Kameng,… — under environmental review, 13.8 km away
- 158 Mtr Long Approach Road to Under Construction Major Permanent Pinjoli… — forest land use approved, 16.2 km away
- 158 Mtr Long Approach Road to Under Construction Major Pmt Pinjoli Bridge Over… — decision issued, 16.2 km away
- Diversion Proposal of 5336 sq.mtrs (0.534 Ha) of Forest land for Construction… — application filed, 20.2 km away
About this information