Quick answers
What is 132 kV S/C (on D/C Tower) Kimi-Khuppi Transmission Line?
132 kV S/C (on D/C Tower) Kimi-Khuppi Transmission Line is a proposed power project in Kimi Village, Jamiri Circle, West Kameng, Arunachal Pradesh. The site covers 167.3 acres.
Who is building it?
The applicant is Department of Power Government of Arunachal Pradesh.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Kimi Village, Jamiri Circle, West Kameng, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹58.8 crore and a site of 167.3 acres.
When was it filed?
The application was filed on 12 Dec 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: 132 kV S/C (on D/C Tower) Kimi-Khuppi Transmission Line
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 25 Nov 2026 |
| Application filed | 12 Dec 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Department of Power Government of Arunachal Pradesh |
| Land area | 167.3 acres (67.7 ha) |
| Project cost | ₹58.8 crore |
| Village / locality | Kimi Village |
| Taluk / tehsil | Jamiri Circle |
| District | West Kameng |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00293 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Dec 2025 (this page) | Under wildlife review | 167.3 acres | ₹58.8 crore |
| New project filed 12 Dec 2025 | More information requested | 280 acres | ₹58.8 crore |
Where it is
Kimi Village, Jamiri Circle, West Kameng, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 132 kV S/C (on D/C Tower) Kimi-Khuppi Transmission Line — more information requested, 0 m away
- Mining of Dolomite Mineral for Dedza Dolomite Deposit — under forest review, 13.8 km away
- Mining of Dolomite Mineral for Dedza Dolomite Deposit — lapsed, 13.8 km away
- Mining of Dolomite mineral for Dedza Dolomite deposit in proposed Dedza mines,… — cleared for impact study, 13.8 km away
- Mining of Minor Mineral (Dolomite) in Dedza Area, District- West Kameng,… — under environmental review, 13.8 km away
- 158 Mtr Long Approach Road to Under Construction Major Permanent Pinjoli… — forest land use approved, 16.2 km away
- 158 Mtr Long Approach Road to Under Construction Major Pmt Pinjoli Bridge Over… — decision issued, 16.2 km away
- Diversion Proposal of 5336 sq.mtrs (0.534 Ha) of Forest land for Construction… — application filed, 20.2 km away