What is Mining of Dolomite Mineral for Dedza Dolomite Deposit?
Mining of Dolomite Mineral for Dedza Dolomite Deposit is a lapsed mining project in 14 Brtf Labour Camp, Singchung Adc, West Kameng, Arunachal Pradesh. The site covers 460.6 acres.
Who is building it?
The applicant is Metis Steel Private Limited.
Has it been approved?
No. The application was lapsed on 2 Feb 2026, so it is no longer under consideration.
Where is it?
In 14 Brtf Labour Camp, Singchung Adc, West Kameng, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹20 crore; a site of 460.6 acres and 106.3 acres (43 ha) of forest land.
When was it filed?
The application was filed on 15 Oct 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining of Dolomite Mineral for Dedza Dolomite Deposit
Project details
| Official title | Mining of Dolomite Mineral for Dedza Dolomite Deposit in the District of West Kameng, Arunachal Pradesh |
|---|---|
| Status | Lapsed |
| Status since | 2 Feb 2026 |
| Application filed | 15 Oct 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Metis Steel Private Limited |
| Land area | 460.6 acres (186.4 ha) |
| Forest land | 106.3 acres (43 ha) |
| Project cost | ₹20 crore |
| Village / locality | 14 Brtf Labour Camp |
| Taluk / tehsil | Singchung Adc |
| District | West Kameng |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00221 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Feb 2026 | Under forest review | 460.6 acres | ₹20 crore |
| New project filed 15 Oct 2025 (this page) | Lapsed | 460.6 acres | ₹20 crore |
In context
11 applications in West Kameng since January 2022 are in the same category (Mining): 5 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 460.6 acres, this one is smaller than 64% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
14 Brtf Labour Camp, Singchung Adc, West Kameng, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining of Dolomite Mineral for Dedza Dolomite Deposit — under forest review, 0 m away
- Mining of Dolomite mineral for Dedza Dolomite deposit in proposed Dedza mines,… — cleared for impact study, 0 m away
- Mining of Minor Mineral (Dolomite) in Dedza Area, District- West Kameng,… — under environmental review, 0 m away
- 132 kV S/C (on D/C Tower) Kimi-Khuppi Transmission Line — more information requested, 13.8 km away
- 132 kV S/C (on D/C Tower) Kimi-Khuppi Transmission Line — under wildlife review, 13.8 km away
- 158 Mtr Long Approach Road to Under Construction Major Pmt Pinjoli Bridge Over… — decision issued, 13.9 km away
- 158 Mtr Long Approach Road to Under Construction Major Permanent Pinjoli… — forest land use approved, 14 km away
- Reconnaissance survey for Tungsten, tin &associated mineralisation in Saleri… — forest land use approved, 18.6 km away
More from Metis Steel Private Limited in West Kameng
- Mining of Dolomite mineral for Dedza Dolomite deposit in proposed Dedza mines,… — cleared for impact study
- Mining of Minor Mineral (Dolomite) in Dedza Area, District- West Kameng,… — under environmental review
4 Metis Steel projects in West Kameng
All 6 Metis Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.