Quick answers
What is this project?
Diversion of 28.28 Ha Forest Land for Construction of Double Lane Road to Provide Air Connectivity Between Donyi Polo Airport, Itanagar and Naharlagun Railway Station Via Sonajuli and Durpang (0.00 to 34.09 Km) is a proposed road project in Ania Hapa, Banderdawa, Papum Pare, Arunachal Pradesh. The site covers 106 acres.
Who is building it?
The applicant is Executive Engineer PWD Naharlagun Division Arunachal Pradesh.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Ania Hapa, Banderdawa, Papum Pare, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹323.2 crore; a site of 106 acres and 69.9 acres (28.3 ha) of forest land.
When was it filed?
The application was filed on 19 Aug 2024.
Project details
| Official title | Proposal for Diversion of 28.28 Ha Forest Land for Construction of Double Lane Road to Provide Air Connectivity Between Donyi Polo Airport, Itanagar and Naharlagun Railway Station Via Sonajuli and Durpang (0.00 to 34.09 Km) |
|---|---|
| Status | Under forest review |
| Status since | 20 Nov 2026 |
| Application filed | 19 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer PWD Naharlagun Division Arunachal Pradesh |
| Land area | 106 acres (42.9 ha) |
| Forest land | 69.9 acres (28.3 ha) |
| Project cost | ₹323.2 crore |
| Village / locality | Ania Hapa |
| Taluk / tehsil | Banderdawa |
| District | Papum Pare |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00140 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ania Hapa, Banderdawa, Papum Pare, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 11.948 Ha Forest Land for Construction of Double Lane Road to… — lapsed, 100 m away
- Diversion of 11.948 Ha Forest Land for Construction of Double Lane Road to… — lapsed, 100 m away
- Prooposal for Diversion of 7.30 Ha of Forest Land for Establishment of Jnv… — lapsed, 5 km away
- Diversion of 14.87 ha of forest land for Establishment of Multi-purpose Sport… — lapsed, 5.6 km away
- Diversion of forest land measuring 0.3728 Ha for construction of RT-02 Station… — withdrawn, 8.5 km away
- Diversion of forest land measuring 0.3728 Ha for construction of RT-02 Station… — lapsed, 8.5 km away
- 50 TPD Scientific Waste Disposal Facility — under environmental review, 8.6 km away
- Diversion of 0.0969 ha of forest land for Establishment of Bharat Petroleum… — under wildlife review, 8.9 km away
More from Executive Engineer PWD Naharlagun Division Arunachal Pradesh in Papum Pare
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.