Quick answers
What is this project?
Diversion of 11.948 Ha Forest Land for Construction of Double Lane Road to Provide Air Connectivity Between Donyi Polo Airport, Itanagar and Naharlagun Railway Station Via Sonajuli and Durpang in Assam (0.00 to 33.79 Km) is a lapsed road project in Ruru Hapa, Banderdawa, Papum Pare, Arunachal Pradesh. The site covers 105.1 acres.
Who is building it?
The applicant is PWD, Government of Arunachal Pradesh.
Has it been approved?
No. The application was lapsed on 23 Jul 2024, so it is no longer under consideration.
Where is it?
In Ruru Hapa, Banderdawa, Papum Pare, Arunachal Pradesh.
How big is it?
It has a stated cost of ₹323.2 crore; a site of 105.1 acres and 29.5 acres (11.9 ha) of forest land.
When was it filed?
The application was filed on 3 Jul 2024.
Project details
| Official title | Proposal for Diversion of 11.948 Ha Forest Land for Construction of Double Lane Road to Provide Air Connectivity Between Donyi Polo Airport, Itanagar and Naharlagun Railway Station Via Sonajuli and Durpang in Assam (0.00 to 33.79 Km) |
|---|---|
| Status | Lapsed |
| Status since | 23 Jul 2024 |
| Application filed | 3 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | PWD, Government of Arunachal Pradesh |
| Land area | 105.1 acres (42.5 ha) |
| Forest land | 29.5 acres (11.9 ha) |
| Project cost | ₹323.2 crore |
| Village / locality | Ruru Hapa |
| Taluk / tehsil | Banderdawa |
| District | Papum Pare |
| State | Arunachal Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AR-00187 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ruru Hapa, Banderdawa, Papum Pare, Arunachal Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 11.948 Ha Forest Land for Construction of Double Lane Road to… — lapsed, 0 m away
- Diversion of 28.28 Ha Forest Land for Construction of Double Lane Road to… — under forest review, 100 m away
- Prooposal for Diversion of 7.30 Ha of Forest Land for Establishment of Jnv… — lapsed, 4.9 km away
- Diversion of 14.87 ha of forest land for Establishment of Multi-purpose Sport… — lapsed, 5.5 km away
- Diversion of forest land measuring 0.3728 Ha for construction of RT-02 Station… — withdrawn, 8.4 km away
- Diversion of forest land measuring 0.3728 Ha for construction of RT-02 Station… — lapsed, 8.4 km away
- 50 TPD Scientific Waste Disposal Facility — under environmental review, 8.5 km away
- Diversion of 0.0969 ha of forest land for Establishment of Bharat Petroleum… — under wildlife review, 9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.