Quick answers
What is Patt Land Ordinary Earth Mining Permit Area at Tikar Mouza?
Patt Land Ordinary Earth Mining Permit Area at Tikar Mouza is a lapsed mining project in Mohakal Vii, Karimganj, Assam. The site covers 3.8 acres.
Who is building it?
The applicant is Biswajit Das.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Mohakal Vii, Karimganj, Assam.
How big is it?
It has a stated cost of ₹20 lakh and a site of 3.8 acres.
When was it filed?
The application was filed on 1 Feb 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 1 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Biswajit Das |
| Land area | 3.8 acres (1.5 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Mohakal Vii |
| Taluk / tehsil | Karimganj |
| District | Karimganj |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00271 |
In context
35 applications in Karimganj since January 2022 are in the same category (Mining): 22 approved, 5 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.8 acres, this one is smaller than 60% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Mohakal Vii, Karimganj, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Patta Land Ordinary Earth Mining Permit Area at Tikor Mouza — initial checks, 0 m away
- Proposed Cement and Cement Clinker manufacturing Unit [Cement 0.66 MTPA (OPC… — environmental approval granted, 11.3 km away
- Industrial project by Valley Strong Cements (Assam) Limited — withdrawn, 11.3 km away
- Proposed 1500 TPD Clinkerisation plant — environmental approval granted, 11.6 km away
- Proposed 1500 TPD Clinkerisation plant — cleared for impact study, 11.6 km away
- Govt. Land Ordinary Earth Mining Permit Area at Keutkuna Pt III Mouza(Block A) — environmental approval granted, 13.1 km away
- Govt. Land Ordinary Earth Mining Permit Area at Keutkuna Pt III Mouza(Block D) — lapsed, 13.4 km away
- Govt. Land Ordinary Earth Mining Permit Area at Keutkuna Pt III Mouza(Block C) — lapsed, 13.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.