Quick answers
What is Industrial project by Valley Strong Cements (Assam) Limited?
This withdrawn industrial project by Valley Strong Cements (Assam) Limited is in Jum Vii, Karimganj, Assam. The site covers 157.8 acres.
Who is building it?
The applicant is Valley Strong Cements (Assam) Limited.
Has it been approved?
No. The application was withdrawn on 20 Feb 2024, so it is no longer under consideration.
Where is it?
In Jum Vii, Karimganj, Assam.
How big is it?
It has a stated cost of ₹360 crore and a site of 157.8 acres.
When was it filed?
The application was filed on 9 Feb 2024.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 20 Feb 2024 |
| Application filed | 9 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Industry |
| Applicant | Valley Strong Cements (Assam) Limited |
| Land area | 157.8 acres (63.9 ha) |
| Project cost | ₹360 crore |
| Village / locality | Jum Vii |
| Taluk / tehsil | Karimganj |
| District | Karimganj |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-00675 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jum Vii, Karimganj, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Cement and Cement Clinker manufacturing Unit [Cement 0.66 MTPA (OPC… — environmental approval granted, 50 m away
- Proposed 1500 TPD Clinkerisation plant — environmental approval granted, 300 m away
- Proposed 1500 TPD Clinkerisation plant — cleared for impact study, 300 m away
- Patt Land Ordinary Earth Mining Permit Area at Tikar Mouza — lapsed, 11.3 km away
- Patta Land Ordinary Earth Mining Permit Area at Tikor Mouza — initial checks, 11.3 km away
- Longai Sand Minor Mineral Unit 3a — under environmental review, 23.7 km away
- Longai Sand Minor Mineral Unit No.3b — environmental approval granted, 23.8 km away
- Govt. Land Ordinary Earth Mining Permit Area at Keutkuna Pt III Mouza(Block A) — environmental approval granted, 24.3 km away
More from Valley Strong Cements (Assam) Limited in Karimganj
- Proposed 1500 TPD Clinkerisation plant — environmental approval granted
- Proposed 1500 TPD Clinkerisation plant — cleared for impact study
- Proposed Cement and Cement Clinker manufacturing Unit [Cement 0.66 MTPA (OPC… — environmental approval granted
All 4 Valley Strong Cements projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.