Quick answers
What is Patta Land Ordinary Earth Mining Permit Area at Tikor Mouza?
Patta Land Ordinary Earth Mining Permit Area at Tikor Mouza is a proposed mining project in Mohakal Vii, Karimganj, Assam. The site covers 2.7 acres.
Who is building it?
The applicant is Abu Mohammed Danish.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Mohakal Vii, Karimganj, Assam.
How big is it?
It has a stated cost of ₹48 lakh and a site of 2.7 acres.
When was it filed?
The application was filed on 23 Nov 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 23 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Abu Mohammed Danish |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹48 lakh |
| Village / locality | Mohakal Vii |
| Taluk / tehsil | Karimganj |
| District | Karimganj |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-02150 |
In context
35 applications in Karimganj since January 2022 are in the same category (Mining): 22 approved, 5 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.7 acres, this one is smaller than 66% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Mohakal Vii, Karimganj, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Patt Land Ordinary Earth Mining Permit Area at Tikar Mouza — lapsed, 0 m away
- Proposed Cement and Cement Clinker manufacturing Unit [Cement 0.66 MTPA (OPC… — environmental approval granted, 11.3 km away
- Industrial project by Valley Strong Cements (Assam) Limited — withdrawn, 11.3 km away
- Proposed 1500 TPD Clinkerisation plant — environmental approval granted, 11.6 km away
- Proposed 1500 TPD Clinkerisation plant — cleared for impact study, 11.6 km away
- Govt. Land Ordinary Earth Mining Permit Area at Keutkuna Pt III Mouza(Block A) — environmental approval granted, 13.1 km away
- Govt. Land Ordinary Earth Mining Permit Area at Keutkuna Pt III Mouza(Block D) — lapsed, 13.4 km away
- Govt. Land Ordinary Earth Mining Permit Area at Keutkuna Pt III Mouza(Block C) — lapsed, 13.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.