Quick answers
What is Garampani Coal Mine?
Garampani Coal Mine is a lapsed mining project in Na, Silonijan, Dima Hasao, Assam. The site covers 269.3 acres.
Who is building it?
The applicant is Assam Mineral Development Corporation Limited.
Has it been approved?
No. The application was lapsed on 10 May 2026, so it is no longer under consideration.
Where is it?
In Na, Silonijan, Dima Hasao, Assam.
How big is it?
It has a stated cost of ₹215 crore and a site of 269.3 acres.
When was it filed?
The application was filed on 16 Jan 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Garampani Coal Mine
Project details
| Status | Lapsed |
|---|---|
| Status since | 10 May 2026 |
| Application filed | 16 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Assam Mineral Development Corporation Limited |
| Land area | 269.3 acres (109 ha) |
| Project cost | ₹215 crore |
| Village / locality | Na |
| Taluk / tehsil | Silonijan |
| District | Dima Hasao |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-01751 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Jan 2026 (this page) | Lapsed | 269.3 acres | ₹215 crore |
| Early planning filed 22 Apr 2024 | Cleared for impact study | 269.3 acres | ₹215 crore |
In context
90 applications in Dima Hasao since January 2022 are in the same category (Mining): 70 approved, 6 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 269.3 acres, this one is larger than 81% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Na, Silonijan, Dima Hasao, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Garampani Coal Mine — cleared for impact study, 0 m away
- Integrated Cement Plant with production capacity of Clinker - 8.0 Million TPA… — returned to applicant, 2.9 km away
- Integrated Cement Plant with production capacity of Clinker - 8.0 Million TPA… — cleared for impact study, 3.4 km away
- Proposed North Boro Hundong Limestone Block (Part – A), Auctioned Block Area:… — environmental approval granted, 3.7 km away
- Proposed North Boro Hundong Limestone Block (Part – A), Auctioned Block Area:… — cleared for impact study, 3.7 km away
- Integrated Cement Plant with production capacity of Clinker: 8.0 Milllion TPA… — returned to applicant, 3.8 km away
- Proposed Integrated Cement Plant with production capacity of Clinker: 8.0… — environmental approval granted, 3.9 km away
- Proposed Integrated Cement Plant with production capacity of Clinker: 8.0… — cleared for impact study, 3.9 km away
More from Assam Mineral Development Corporation Limited in Dima Hasao
- New Umrangso Limestone Block (Area: 31 ha) with Limestone Production Capacity:… — under environmental review
- New Umrangso Limestone Block (Area: 30 ha) with Limestone Production Capacity:… — under environmental review
7 Assam Mineral Development Corporation projects in Dima Hasao
All 21 Assam Mineral Development Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.