Quick answers
What is this project?
Diversion of 0.0144 Hectare of Forest Land for Construction of Mobile Tower Location at Simlaguri Forest Block, Under Chirang Division is a lapsed telecom project in Bengtol Reserved Forest, Srijangram, Chirang, Assam. The site covers 0 acres.
Who is building it?
The applicant is Indus Towers Limited.
Has it been approved?
No. The application was lapsed on 13 Oct 2026, so it is no longer under consideration.
Where is it?
In Bengtol Reserved Forest, Srijangram, Chirang, Assam.
How big is it?
It has a stated cost of ₹25 lakh; a site of 0 acres and 140 m² of forest land.
When was it filed?
The application was filed on 15 May 2023.
Project details
| Official title | Proposal for Diversion of 0.0144 Hectare of Forest Land for Construction of Mobile Tower Location at Simlaguri Forest Block, Under Chirang Division |
|---|---|
| Status | Lapsed |
| Status since | 13 Oct 2026 |
| Application filed | 15 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Indus Towers Limited |
| Land area | 100 m² |
| Forest land | 140 m² |
| Project cost | ₹25 lakh |
| Village / locality | Bengtol Reserved Forest |
| Taluk / tehsil | Srijangram |
| District | Chirang |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-02044 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bengtol Reserved Forest, Srijangram, Chirang, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Feasibility Study and Preparation of Detailed Project Report for Construction… — more information requested, 3.6 km away
- Feasibility Study and Preparation of Detailed Project Report for Construction… — under wildlife review, 3.6 km away
- Govt. Permit Area of Deosri Aie River — lapsed, 6.7 km away
- Govt. Permit Area of Deosri Aie River — environmental approval granted, 6.7 km away
- Burijhar Aie River Sand, Gravel & Boulder Mahal — lapsed, 7.8 km away
- Taklai River Mahal at Betini F.V — lapsed, 9.4 km away
- Taklai River Mahal at Betini F.V — lapsed, 9.4 km away
- North Taklai Sand Gravel Stone and Boulder Mahal at Malavita Rf — lapsed, 11.1 km away
All 165 Indus Towers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.