Quick answers
What is this project?
Feasibility Study and Preparation of Detailed Project Report for Construction & Up-Gradation of the Newly Declared Nh-127c Starting From Near Bhurtiniali to Galengphu (Indo-Bhutan Border) in the State of Assam to NH Standard is a proposed project in Bengtol Reserved Forest, Srijangram, Chirang, Assam. The site covers 150.1 acres.
Who is building it?
The applicant is Executive Engineer Pwd NH Abhayapuri Construction Division Abhayapuri.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Bengtol Reserved Forest, Srijangram, Chirang, Assam.
How big is it?
It has a stated cost of ₹571.7 crore and a site of 150.1 acres.
When was it filed?
The application was filed on 15 Oct 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Feasibility Study and Preparation of Detailed Project Report for Construction &…
Project details
| Status | Under wildlife review |
|---|---|
| Status since | 12 Nov 2026 |
| Application filed | 15 Oct 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Executive Engineer Pwd NH Abhayapuri Construction Division Abhayapuri |
| Land area | 150.1 acres (60.8 ha) |
| Project cost | ₹571.7 crore |
| Village / locality | Bengtol Reserved Forest |
| Taluk / tehsil | Srijangram |
| District | Chirang |
| State | Assam |
| Location from | Site boundary on record |
| Our reference | WID-AS-02139 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Oct 2026 | More information requested | 150.1 acres | ₹571.7 crore |
| New project filed 15 Oct 2026 (this page) | Under wildlife review | 150.1 acres | ₹571.7 crore |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bengtol Reserved Forest, Srijangram, Chirang, Assam. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Feasibility Study and Preparation of Detailed Project Report for Construction… — more information requested, 0 m away
- Govt. Permit Area of Deosri Aie River — lapsed, 3 km away
- Govt. Permit Area of Deosri Aie River — environmental approval granted, 3 km away
- Diversion of 0.0144 Hectare of Forest Land for Construction of Mobile Tower… — lapsed, 3.6 km away
- Taklai River Mahal at Betini F.V — lapsed, 5.8 km away
- Taklai River Mahal at Betini F.V — lapsed, 5.8 km away
- Burijhar Aie River Sand, Gravel & Boulder Mahal — lapsed, 6.9 km away
- North Taklai Sand Gravel Stone and Boulder Mahal at Malavita Rf — lapsed, 7.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.