What is Developing? Open the mapMap

Cleared for impact studyMining · Bhojpur, Bihar

Proposed Sand Mining Project of Area 34 Ha at Bhojpur Ghat 03 on Sone River of District-Bhojpur State-Bihar.

Proposed Sand Mining Project of Area 34 Ha at Bhojpur Ghat 03 on Sone River of District-Bhojpur State-Bihar is a proposed mining project in Suraudha, Koilwar, Bhojpur, Bihar. The site covers 84 acres. Its stated project cost is ₹10.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 13 Feb 2023).

See it on the live map All projects in Bhojpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 34 Ha at Bhojpur Ghat 03 on Sone River of District-Bhojpur State-Bihar is a proposed mining project in Suraudha, Koilwar, Bhojpur, Bihar. The site covers 84 acres.

Who is building it?

The applicant is Maa Rajeshwari Construction Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 13 Feb 2023), as of 27 Nov 2026.

Where is it?

In Suraudha, Koilwar, Bhojpur, Bihar.

How big is it?

It has a stated cost of ₹10.5 crore and a site of 84 acres.

When was it filed?

The application was filed on 13 Feb 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 34 Ha at Bhojpur Ghat 03 on Sone River of…

Project details

StatusCleared for impact study
Status since13 Feb 2023
Application filed13 Feb 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantMaa Rajeshwari Construction Private Limited
Land area84 acres (34 ha)
Project cost₹10.5 crore
Village / localitySuraudha
Taluk / tehsilKoilwar
DistrictBhojpur
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00482

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 21 Aug 2023Environmental approval granted84 acres₹10.5 crore
Early planning filed 13 Feb 2023 (this page)Cleared for impact study84 acres₹10.5 crore

In context

142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 84 acres, this one is larger than 65% of them.

No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.

Where it is

Suraudha, Koilwar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.