Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Aug 2023 |
| Application filed | 12 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sanjay Kumar |
| Land area | 31.4 acres (12.7 ha) |
| Project cost | ₹12.3 crore |
| Village / locality | Nongarh |
| Taluk / tehsil | Ramgarh Chowk |
| District | Lakhisarai |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00109 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Aug 2023 (this page) | Environmental approval granted | 31.4 acres | ₹12.3 crore |
| Early planning filed 23 Jan 2023 | Cleared for impact study | 31.4 acres | ₹12.3 crore |
In context
38 applications in Lakhisarai since January 2022 are in the same category (Mining): 33 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 31.4 acres, this one is smaller than 53% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Nongarh, Ramgarh Chowk, Lakhisarai, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Ghat Mining Project (Lakhisarai Block No.- 09) at Riverbed of Kiul River — cleared for impact study, 0 m away
- Proposed Sand Mining Project of Area 33.2 Ha at Lakhisarai Kiul-08 Ghat on… — environmental approval granted, 700 m away
- Proposed Sand Mining Project of Area 33.2 Ha at Lakhisarai Kiul-08 Ghat on… — cleared for impact study, 700 m away
- Sand Mining Project at Block No. 10 on Kiul River of District - Lakhisarai… — environmental approval granted, 1 km away
- Sand Mining Project at Block No. 10 on Kiul River of District - Lakhisarai… — cleared for impact study, 1 km away
- Sand Mining Project at Kiul River Cluster II (Block No.- 11 & 12) Lakhisarai… — environmental approval granted, 1.4 km away
- Sand Mining Project at Kiul River Cluster II (Block No.- 11 & 12) Lakhisarai… — cleared for impact study, 1.4 km away
- Sand Mining Project (Block No.- 07 Sand Ghat) — cleared for impact study, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.