Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Aug 2023 |
| Application filed | 30 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rudra Mining LLP |
| Land area | 82 acres (33.2 ha) |
| Project cost | ₹6.6 crore |
| Village / locality | Batta |
| Taluk / tehsil | Chanan* |
| District | Lakhisarai |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00419 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Aug 2023 (this page) | Environmental approval granted | 82 acres | ₹6.6 crore |
| Early planning filed 14 Feb 2023 | Cleared for impact study | 82 acres | ₹6.6 crore |
In context
38 applications in Lakhisarai since January 2022 are in the same category (Mining): 33 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 82 acres, this one is larger than 74% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Batta, Chanan*, Lakhisarai, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 33.2 Ha at Lakhisarai Kiul-08 Ghat on… — cleared for impact study, 0 m away
- Sand Ghat Mining Project (Lakhisarai Block No.- 09) at Riverbed of Kiul River — environmental approval granted, 700 m away
- Sand Ghat Mining Project (Lakhisarai Block No.- 09) at Riverbed of Kiul River — cleared for impact study, 700 m away
- Sand Mining Project (Block No.- 07 Sand Ghat) — cleared for impact study, 1.1 km away
- Sand Mining Project (Block No.- 07 Sand Ghat) — environmental approval granted, 1.1 km away
- Sand Mining Project at Block No. 10 on Kiul River of District - Lakhisarai… — environmental approval granted, 1.7 km away
- Sand Mining Project at Block No. 10 on Kiul River of District - Lakhisarai… — cleared for impact study, 1.7 km away
- Sand Mining Project at Kiul River Cluster II (Block No.- 11 & 12) Lakhisarai… — environmental approval granted, 2 km away
All 4 Rudra Mining projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.