Quick answers
What is this project?
Sand Mining Project of Area 9.37 Ha at Sand Block-05 Ghat on Ulai River of District-Jamui of State-Bihar is an approved mining project in Hathia, Jhajha, Jamui, Bihar. The site covers 23.2 acres.
Who is building it?
The applicant is Sanjay Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Dec 2023), as of 27 Nov 2026.
Where is it?
In Hathia, Jhajha, Jamui, Bihar.
How big is it?
It has a stated cost of ₹2.9 crore and a site of 23.2 acres.
When was it filed?
The application was filed on 16 Dec 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Dec 2023 |
| Application filed | 16 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sanjay Kumar |
| Land area | 23.2 acres (9.4 ha) |
| Project cost | ₹2.9 crore |
| Village / locality | Hathia |
| Taluk / tehsil | Jhajha |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00147 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Dec 2023 (this page) | Environmental approval granted | 23.2 acres | ₹2.9 crore |
| Early planning filed 8 Feb 2023 | Cleared for impact study | 23.2 acres | ₹2.9 crore |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 23.2 acres, this one is larger than 50% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Hathia, Jhajha, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Bihar's ₹2,579 Crore Barnar Reservoir Project Advances Towards Implementation After Decades of Delay (5.5 km away).
Other projects nearby
- Sand Mining Project of Area 9.37 Ha at Sand Block-05 Ghat on Ulai River of… — cleared for impact study, 0 m away
- M/s Ganpati Bricks Proposed Brick clay mining project at Mauza-Sohjana,… — environmental approval granted, 1.1 km away
- Brick Earth Mining project of M/s Khan Bricks Industries at Mauza- Hathia,… — environmental approval granted, 1.2 km away
- Grid Connectivity to vilages of Barhat, Chakai, Jhajha, Laxmipur and Sono… — under forest review, 4.1 km away
- Grid Connectivity to vilages of Barhat, Chakai, Jhajha, Laxmipur and Sono… — application filed, 4.1 km away
- Brick Earth mining project of M/s- Raj Chimney at Mouja- Telia Chhorath ,… — environmental approval granted, 4.5 km away
- Diversion of 0.0450 ha of forest land for construction of approach road for… — more information requested, 4.8 km away
- Sand Mining Project, Jamui Barnar-08 Sand Ghat — environmental approval granted, 5.2 km away
More from Sanjay Kumar in Jamui
- Sand Ghat Mining Project (Jamui Kiul Block - 03) at Riverbed of Kiul River — cleared for impact study
- Sand Mining Project, Jamui Barnar-14 Sand Ghat of District- Jamui, State-Bihar. — environmental approval granted
- Sand Ghat Mining Project (Jamui Kiul Block - 03) at Riverbed of Kiul River — environmental approval granted
- Sand Mining Project, Jamui Barnar-14 Sand Ghat of District- Jamui, State-Bihar. — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.