Quick answers
What is this project?
Sand Ghat Mining Project (Jamui Kiul Block - 03) at Riverbed of Kiul River is an approved mining project in Baribag Jaljoga, Khaira, Jamui, Bihar. The site covers 86.2 acres.
Who is building it?
The applicant is Sanjay Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Sept 2023), as of 27 Nov 2026.
Where is it?
In Baribag Jaljoga, Khaira, Jamui, Bihar.
How big is it?
It has a stated cost of ₹6.2 crore and a site of 86.2 acres.
When was it filed?
The application was filed on 22 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Sept 2023 |
| Application filed | 22 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sanjay Kumar |
| Land area | 86.2 acres (34.9 ha) |
| Project cost | ₹6.2 crore |
| Village / locality | Baribag Jaljoga |
| Taluk / tehsil | Khaira |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00416 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 | Cleared for impact study | 86.2 acres | ₹6.2 crore |
| New project filed 22 Sept 2023 (this page) | Environmental approval granted | 86.2 acres | ₹6.2 crore |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 86.2 acres, this one is larger than 88% of them.
No other mining lease on record is within 500 m of this site; 11 have applied within 5 km.
Where it is
Baribag Jaljoga, Khaira, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Ghat Mining Project (Jamui Kiul Block - 03) at Riverbed of Kiul River — cleared for impact study, 0 m away
- Proposed Brick Earth Mining Project of M/s Mata Ita Udyog at Mauza - Badibag,… — environmental approval granted, 900 m away
- Sand Mining Project (Jamui Kiul Block 02 Sand Ghat) at Riverbed of Kiul River — environmental approval granted, 1.4 km away
- Sand Mining Project (Jamui Kiul Block 02 Sand Ghat) at Riverbed of Kiul River — cleared for impact study, 1.4 km away
- Sand Mining Project of Area 14.4 Ha at Sand Block-04 Ghat on Kiul River of… — environmental approval granted, 1.5 km away
- Sand Mining Project of Area 14.4 Ha at Sand Block-04 Ghat on Kiul River of… — cleared for impact study, 1.5 km away
- Sand Ghat Mining Project (Block – 01 Fathepur Sand Ghat) at Riverbed of… — environmental approval granted, 1.7 km away
- Sand Ghat Mining Project (Block – 01 Fathepur Sand Ghat) at Riverbed of… — cleared for impact study, 1.7 km away
More from Sanjay Kumar in Jamui
- Sand Mining Project of Area 9.37 Ha at Sand Block-05 Ghat on Ulai River of… — environmental approval granted
- Sand Mining Project, Jamui Barnar-14 Sand Ghat of District- Jamui, State-Bihar. — environmental approval granted
- Sand Mining Project of Area 9.37 Ha at Sand Block-05 Ghat on Ulai River of… — cleared for impact study
- Sand Mining Project, Jamui Barnar-14 Sand Ghat of District- Jamui, State-Bihar. — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.