What is this project?
M/s Ganpati Bricks Proposed Brick clay mining project at Mauza-Sohjana, Block-Jhajha, District- Jamui, Bihar. ( Mining Area: 1.11 Ha.) is an approved mining project in Sahajana, Jhajha, Jamui, Bihar. The site covers 2.7 acres.
Who is building it?
The applicant is Sanjay Kumar Gupta.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Jun 2026), as of 27 Nov 2026.
Where is it?
In Sahajana, Jhajha, Jamui, Bihar.
How big is it?
It has a stated cost of ₹7 lakh and a site of 2.7 acres.
When was it filed?
The application was filed on 18 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Jun 2026 |
| Application filed | 18 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sanjay Kumar Gupta |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹7 lakh |
| Village / locality | Sahajana |
| Taluk / tehsil | Jhajha |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02034 |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 2.7 acres, this one is smaller than 98% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Sahajana, Jhajha, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Bihar's ₹2,579 Crore Barnar Reservoir Project Advances Towards Implementation After Decades of Delay (5.3 km away).
Other projects nearby
- Sand Mining Project of Area 9.37 Ha at Sand Block-05 Ghat on Ulai River of… — environmental approval granted, 1.1 km away
- Sand Mining Project of Area 9.37 Ha at Sand Block-05 Ghat on Ulai River of… — cleared for impact study, 1.1 km away
- Brick Earth Mining project of M/s Khan Bricks Industries at Mauza- Hathia,… — environmental approval granted, 1.7 km away
- Grid Connectivity to vilages of Barhat, Chakai, Jhajha, Laxmipur and Sono… — under forest review, 4.1 km away
- Grid Connectivity to vilages of Barhat, Chakai, Jhajha, Laxmipur and Sono… — application filed, 4.1 km away
- Transfer of Jamui Sand Ghat Ulai Block 04 Area 5.0 Hect Vill -Tola Satighat,… — environmental approval granted, 4.6 km away
- Sand Ghat Mining Project (Ulai River Block No. -04 Sand Ghat) of District-… — environmental approval granted, 4.6 km away
- Sand Ghat Mining Project (Ulai River Block No. -04 Sand Ghat) of District-… — cleared for impact study, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.