Cleared for impact studyMining · Jamui, Bihar

Proposed Sand Mining Project of Area 10.2 Ha at Kiul River Block -06, District- Jamui, State - Bihar on River Kiul

Proposed Sand Mining Project of Area 10.2 Ha at Kiul River Block -06, District- Jamui, State - Bihar on River Kiul is a proposed mining project in Bela, Khaira, Jamui, Bihar. The site covers 25.2 acres. Its stated project cost is ₹1.1 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 24 Jan 2023).

See it on the live map All projects in Jamui

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 10.2 Ha at Kiul River Block -06, District- Jamui, State - Bihar on River Kiul is a proposed mining project in Bela, Khaira, Jamui, Bihar. The site covers 25.2 acres.

Who is building it?

The applicant is Animesh Sanwaria.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 24 Jan 2023), as of 27 Nov 2026.

Where is it?

In Bela, Khaira, Jamui, Bihar.

How big is it?

It has a stated cost of ₹1.1 crore and a site of 25.2 acres.

When was it filed?

The application was filed on 24 Jan 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 10.2 Ha at Kiul River Block -06, District- Jamui,…

Project details

StatusCleared for impact study
Status since24 Jan 2023
Application filed24 Jan 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAnimesh Sanwaria
Land area25.2 acres (10.2 ha)
Project cost₹1.1 crore
Village / localityBela
Taluk / tehsilKhaira
DistrictJamui
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00179

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 22 Aug 2023Environmental approval granted25.2 acres₹1.1 crore
Early planning filed 24 Jan 2023 (this page)Cleared for impact study25.2 acres₹1.1 crore

In context

145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 25.2 acres, this one is larger than 59% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 89.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 13 mining leases have applied within 5 km.

Where it is

Bela, Khaira, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.