Quick answers
What is this project?
Sand Mining Project of Area 13.1 Ha at Sand Block-07 Ghat on Kiul River of District-Jamui of State-Bihar is a proposed mining project in Sagdaha, Khaira, Jamui, Bihar. The site covers 32.4 acres.
Who is building it?
The applicant is Ganesh Kumar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 25 May 2023), as of 27 Nov 2026.
Where is it?
In Sagdaha, Khaira, Jamui, Bihar.
How big is it?
It has a stated cost of ₹2.4 crore and a site of 32.4 acres.
When was it filed?
The application was filed on 25 May 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 May 2023 |
| Application filed | 25 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ganesh Kumar |
| Land area | 32.4 acres (13.1 ha) |
| Project cost | ₹2.4 crore |
| Village / locality | Sagdaha |
| Taluk / tehsil | Khaira |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00504 |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 32.4 acres, this one is larger than 60% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 57.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 13 mining leases have applied within 5 km.
Where it is
Sagdaha, Khaira, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Environmental Clearance for Sand Mining Project on Kiul River at… — environmental approval granted, 0 m away
- Sand Mining Project of Area 13.1 Ha at Sand Block-07 Ghat on Kiul River of… — environmental approval granted, 0 m away
- Proposed Sand Mining Project of Area 10.2 Ha at Kiul River Block -06,… — environmental approval granted, 400 m away
- Proposed Sand Mining Project of Area 10.2 Ha at Kiul River Block -06,… — cleared for impact study, 400 m away
- Sand Ghat Mining Project (Jamui Kiul Block - 05) at Kiul River bed — cleared for impact study, 1 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 05) at Kiul River bed — environmental approval granted, 1 km away
- Sand Mining Project, Jamui Kiul Block - 08 Sand Ghat of District- Jamui,… — environmental approval granted, 1.6 km away
- Sand Mining Project, Jamui Kiul Block - 08 Sand Ghat of District- Jamui,… — cleared for impact study, 1.6 km away
More from Ganesh Kumar in Jamui
- Sand Mining Project of Area 13.1 Ha at Sand Block-07 Ghat on Kiul River of… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.