Quick answers
What is this project?
Sand Mining Project, Jamui Kiul Block - 08 Sand Ghat of District- Jamui, State-Bihar is a proposed mining project in Bhandra, Khaira, Jamui, Bihar. The site covers 75.9 acres.
Who is building it?
The applicant is Shakti Inframins Developers Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 May 2023), as of 27 Nov 2026.
Where is it?
In Bhandra, Khaira, Jamui, Bihar.
How big is it?
It has a stated cost of ₹3.5 crore and a site of 75.9 acres.
When was it filed?
The application was filed on 29 May 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project, Jamui Kiul Block - 08 Sand Ghat of District- Jamui, State-Bihar
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 May 2023 |
| Application filed | 29 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shakti Inframins Developers Private Limited |
| Land area | 75.9 acres (30.7 ha) |
| Project cost | ₹3.5 crore |
| Village / locality | Bhandra |
| Taluk / tehsil | Khaira |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00387 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Nov 2023 | Environmental approval granted | 75.9 acres | ₹3.5 crore |
| Early planning filed 29 May 2023 (this page) | Cleared for impact study | 75.9 acres | ₹3.5 crore |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 75.9 acres, this one is larger than 84% of them.
No other mining lease on record is within 500 m of this site; 16 have applied within 5 km.
Where it is
Bhandra, Khaira, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project, Jamui Kiul Block - 08 Sand Ghat of District- Jamui,… — environmental approval granted, 0 m away
- Transfer of Environmental Clearance for Sand Mining Project on Kiul River at… — environmental approval granted, 1.6 km away
- Sand Mining Project of Area 13.1 Ha at Sand Block-07 Ghat on Kiul River of… — environmental approval granted, 1.6 km away
- Sand Mining Project of Area 13.1 Ha at Sand Block-07 Ghat on Kiul River of… — cleared for impact study, 1.6 km away
- Proposed Sand Mining Project of Area 10.2 Ha at Kiul River Block -06,… — environmental approval granted, 1.9 km away
- Proposed Sand Mining Project of Area 10.2 Ha at Kiul River Block -06,… — cleared for impact study, 1.9 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 05) at Kiul River bed — cleared for impact study, 2.6 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 05) at Kiul River bed — environmental approval granted, 2.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.