Proposed Sand Mining Project of Area 29.0 Ha at Block-37 (Gaya Morhar-24) Sand Ghat on River Morhar of District-Gaya, State-Bihar.

Proposed Sand Mining Project of Area 29.0 Ha at Block-37 (Gaya Morhar-24) Sand Ghat on River Morhar of District-Gaya, State-Bihar is a proposed mining project in Babhandih, Imamganj, Gaya, Bihar. The site covers 71.7 acres. Its stated project cost is ₹12.8 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 5 Jun 2023).

See it on the live map All projects in Gaya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project of Area 29.0 Ha at Block-37 (Gaya Morhar-24) Sand Ghat on River Morhar of District-Gaya, State-Bihar is a proposed mining project in Babhandih, Imamganj, Gaya, Bihar. The site covers 71.7 acres.

Who is building it?

The applicant is Dinanath Singh.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 5 Jun 2023), as of 27 Nov 2026.

Where is it?

In Babhandih, Imamganj, Gaya, Bihar.

How big is it?

It has a stated cost of ₹12.8 crore and a site of 71.7 acres.

When was it filed?

The application was filed on 5 Jun 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 29.0 Ha at Block-37 (Gaya Morhar-24) Sand Ghat on…

Project details

StatusCleared for impact study
Status since5 Jun 2023
Application filed5 Jun 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantDinanath Singh
Land area71.7 acres (29 ha)
Project cost₹12.8 crore
Village / localityBabhandih
Taluk / tehsilImamganj
DistrictGaya
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00232

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 24 Aug 2026Environmental approval granted71.7 acres₹12.8 crore
Early planning filed 5 Jun 2023 (this page)Cleared for impact study71.7 acres₹12.8 crore

In context

189 applications in Gaya since January 2022 are in the same category (Mining): 171 approved, 15 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 71.7 acres, this one is larger than 87% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Babhandih, Imamganj, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.