Quick answers
What is this project?
Proposed Sand Mining Project of Area 29.0 Ha at Block-37 (Gaya Morhar-24) Sand Ghat on River Morhar of District-Gaya, State-Bihar is an approved mining project in Babhandih, Imamganj, Gaya, Bihar. The site covers 71.7 acres.
Who is building it?
The applicant is Dinanath Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Nov 2026), as of 27 Nov 2026.
Where is it?
In Babhandih, Imamganj, Gaya, Bihar.
How big is it?
It has a stated cost of ₹12.8 crore and a site of 71.7 acres.
When was it filed?
The application was filed on 24 Aug 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Nov 2026 |
| Application filed | 24 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dinanath Singh |
| Land area | 71.7 acres (29 ha) |
| Project cost | ₹12.8 crore |
| Village / locality | Babhandih |
| Taluk / tehsil | Imamganj |
| District | Gaya |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02663 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Aug 2026 (this page) | Environmental approval granted | 71.7 acres | ₹12.8 crore |
| Early planning filed 5 Jun 2023 | Cleared for impact study | 71.7 acres | ₹12.8 crore |
In context
189 applications in Gaya since January 2022 are in the same category (Mining): 171 approved, 15 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 71.7 acres, this one is larger than 87% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Babhandih, Imamganj, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 29.0 Ha at Block-37 (Gaya Morhar-24) Sand… — cleared for impact study, 0 m away
- Brick Earth Mining for M/S V Swastik S Int Udyog -Chuawar Soil Brick Mining… — environmental approval granted, 1.3 km away
- 4-Lane Staggered Toll Plaza at km 37.100 of Dumaria–Ranitalab Road (SH-69) — under forest review, 2.8 km away
- Construction of Road in Gaya District under MMGSY between Pakari Guriya to… — more information requested, 2.9 km away
- Brick Earth Mining for M/S BSP Int Udyog- Malhari Soil Brick Mining Project at… — environmental approval granted, 4.5 km away
- Fatehpur to Luttitand in Ch Km 0.00 to 4.87 Package No- Br12rc335 — lapsed, 4.7 km away
- Sand Mining Project, Block 36 (Gaya Morhar 23) Sand Ghat of District- Gaya,… — environmental approval granted, 5.3 km away
- Sand Mining Project, Block 36 (Gaya Morhar 23) Sand Ghat of District- Gaya,… — cleared for impact study, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.