Quick answers
What is this project?
Brick Earth Mining for M/S V Swastik S Int Udyog -Chuawar Soil Brick Mining Project is an approved mining project in Chua Bar, Imamganj, Gaya, Bihar. The site covers 4 acres.
Who is building it?
The applicant is Vijay Prasad.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Jul 2025), as of 27 Nov 2026.
Where is it?
In Chua Bar, Imamganj, Gaya, Bihar.
How big is it?
It has a stated cost of ₹5 lakh and a site of 4 acres.
When was it filed?
The application was filed on 11 Jun 2025.
Project details
| Official title | Brick Earth Mining for M/S V Swastik S Int Udyog -Chuawar Soil Brick Mining Project at Village/Mauza- Chuawar, P.O- Pananiya, P.S- Imamganj, District- Gaya (Bihar) |
|---|---|
| Status | Environmental approval granted |
| Status since | 30 Jul 2025 |
| Application filed | 11 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vijay Prasad |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Chua Bar |
| Taluk / tehsil | Imamganj |
| District | Gaya |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00812 |
In context
189 applications in Gaya since January 2022 are in the same category (Mining): 171 approved, 15 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4 acres, this one is smaller than 93% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Chua Bar, Imamganj, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 29.0 Ha at Block-37 (Gaya Morhar-24) Sand… — environmental approval granted, 1.3 km away
- Proposed Sand Mining Project of Area 29.0 Ha at Block-37 (Gaya Morhar-24) Sand… — cleared for impact study, 1.3 km away
- 4-Lane Staggered Toll Plaza at km 37.100 of Dumaria–Ranitalab Road (SH-69) — under forest review, 2.3 km away
- Construction of Road in Gaya District under MMGSY between Pakari Guriya to… — more information requested, 3.3 km away
- Sand Mining Project, Block 36 (Gaya Morhar 23) Sand Ghat of District- Gaya,… — environmental approval granted, 4.2 km away
- Sand Mining Project, Block 36 (Gaya Morhar 23) Sand Ghat of District- Gaya,… — cleared for impact study, 4.2 km away
- Diversion of 0.023 Ha of Forest Land for Construction of Approach Road for… — more information requested, 5 km away
- Brick Earth Mining for M/S BSP Int Udyog- Malhari Soil Brick Mining Project at… — environmental approval granted, 5.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.