Quick answers
What is this project?
Proposed Sand Mining Project of Area 98.93 Ha at Aurangabad Ghat 08 on Sone River of District-Aurangabad State-Bihar is an approved mining project in Daudnagar, Aurangabad, Bihar. The site covers 244.5 acres.
Who is building it?
The applicant is Sivaganesh Narise.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 21 Aug 2023), as of 27 Nov 2026.
Where is it?
In Daudnagar, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹62.4 crore and a site of 244.5 acres.
When was it filed?
The application was filed on 21 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Aug 2023 |
| Application filed | 21 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sivaganesh Narise |
| Land area | 244.5 acres (98.9 ha) |
| Project cost | ₹62.4 crore |
| Village / locality | Daudnagar |
| Taluk / tehsil | Daudnagar |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00259 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 | Cleared for impact study | 244.5 acres | ₹62.4 crore |
| New project filed 21 Aug 2023 (this page) | Environmental approval granted | 244.5 acres | ₹62.4 crore |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 244.5 acres, this one is larger than 99% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Daudnagar, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 98.93 Ha at Aurangabad Ghat 08 on Sone… — cleared for impact study, 0 m away
- Proposed Sand Mining Project of Area 39.97 Ha at Aurangabad Ghat 07 on Sone… — cleared for impact study, 3 km away
- Proposed Sand Mining Project of Area 39.97 Ha at Aurangabad Ghat 07 on Sone… — environmental approval granted, 3 km away
- Proposed Sand Mining Project Aurangabad Sone 6-B on Sone River of District-… — environmental approval granted, 4.2 km away
- Proposed Sand Mining Project Aurangabad Sone 6-B on Sone River of District-… — cleared for impact study, 4.2 km away
- 4 - Lane With Paved Shoulder Daudnagar Bypass From Km 93+915 to Km 102+290 of… — lapsed, 4.3 km away
- 4 - Lane With Paved Shoulder Daudnagar Bypass From Km 93+915 to Km 102+290 of… — lapsed, 4.3 km away
- 4 - Lane With Paved Shoulder Daudnagar Bypass From Km 93+915 to Km 102+290 of… — under forest review, 4.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.