Quick answers
What is this project?
Sand Ghat Mining Project (Ulai River Block No.- 02) at Riverbed of Ulai River is a proposed mining project in Burhnaip, Jhajha, Jamui, Bihar. The site covers 35.6 acres.
Who is building it?
The applicant is Kundan Kumar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Nov 2023), as of 27 Nov 2026.
Where is it?
In Burhnaip, Jhajha, Jamui, Bihar.
How big is it?
It has a stated cost of ₹94 lakh and a site of 35.6 acres.
When was it filed?
The application was filed on 23 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Ghat Mining Project (Ulai River Block No.- 02) at Riverbed of Ulai River
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Kundan Kumar |
| Land area | 35.6 acres (14.4 ha) |
| Project cost | ₹94 lakh |
| Village / locality | Burhnaip |
| Taluk / tehsil | Jhajha |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00262 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 23 Nov 2023 (this page) | Cleared for impact study | 35.6 acres | ₹94 lakh |
| New project filed 16 Sept 2023 | Environmental approval granted | 35.6 acres | ₹94 lakh |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 35.6 acres, this one is larger than 63% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 58.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Burhnaip, Jhajha, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Bihar's ₹2,579 Crore Barnar Reservoir Project Advances Towards Implementation After Decades of Delay (7.4 km away).
Other projects nearby
- Sand Ghat Mining Project (Ulai River Block No.- 02) at Riverbed of Ulai River — environmental approval granted, 0 m away
- Sand Ghat Mining Project (Ulai River Block No. -03) at Riverbed of Ulai River — environmental approval granted, 300 m away
- Sand Ghat Mining Project (Ulai River Block No. -03) at Riverbed of Ulai River — cleared for impact study, 300 m away
- Transfer of Jamui Sand Ghat Ulai Block 04 Area 5.0 Hect Vill -Tola Satighat,… — environmental approval granted, 900 m away
- Sand Ghat Mining Project (Ulai River Block No. -04 Sand Ghat) of District-… — environmental approval granted, 900 m away
- Sand Ghat Mining Project (Ulai River Block No. -04 Sand Ghat) of District-… — cleared for impact study, 900 m away
- Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed — lapsed, 1.2 km away
- Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed — lapsed, 1.2 km away
More from Kundan Kumar in Jamui
- Transfer of Jamui Sand Ghat Ulai Block 04 Area 5.0 Hect Vill -Tola Satighat,… — environmental approval granted
- Transfer of Environmental Clearance for Sand Mining Project on Anjan River at… — environmental approval granted
- Sand Mining Project of Area 05.0 Ha at Sand Block-01 Ghat on Bajan River of… — environmental approval granted
- Sand Mining Project of Area 05.0 Ha at Sand Block-01 Ghat on Bajan River of… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.