What is Developing? Open the mapMap

LapsedMining · Jamui, Bihar

Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed

Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed is a lapsed mining project in Tola Auria, Jhajha, Jamui, Bihar. The site covers 38.3 acres. Its stated project cost is ₹1 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Jamui

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed is a lapsed mining project in Tola Auria, Jhajha, Jamui, Bihar. The site covers 38.3 acres.

Who is building it?

The applicant is Rakesh Kumar Lakhisarai.

Has it been approved?

No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.

Where is it?

In Tola Auria, Jhajha, Jamui, Bihar.

How big is it?

It has a stated cost of ₹1 crore and a site of 38.3 acres.

When was it filed?

The application was filed on 18 Mar 2024.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed

Project details

Official titleSand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed at District- Jamui, Bihar.
StatusLapsed
Status since29 Oct 2024
Application filed18 Mar 2024
Approval soughtEnvironmental approval
Application typeAmendment
SectorMining
ApplicantRakesh Kumar Lakhisarai
Land area38.3 acres (15.5 ha)
Project cost₹1 crore
Village / localityTola Auria
Taluk / tehsilJhajha
DistrictJamui
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00645

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 18 Mar 2024 (this page)Lapsed38.3 acres₹1 crore
Early planning filed 23 Nov 2023Cleared for impact study38.3 acres₹1 crore
New project filed 25 Sept 2023Environmental approval granted38.3 acres₹1 crore

In context

145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 38.3 acres, this one is larger than 68% of them.

No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.

Where it is

Tola Auria, Jhajha, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Bihar's ₹2,579 Crore Barnar Reservoir Project Advances Towards Implementation After Decades of Delay (8 km away).

Other projects nearby

More from Rakesh Kumar Lakhisarai in Jamui

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.