Quick answers
What is this project?
Sand Ghat Mining Project (Ulai River Block No. -04 Sand Ghat) of District- Jamui, State- Bihar is an approved mining project in Tola Satighat, Jhajha, Jamui, Bihar. The site covers 12.4 acres.
Who is building it?
The applicant is Manish Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Jan 2024), as of 27 Nov 2026.
Where is it?
In Tola Satighat, Jhajha, Jamui, Bihar.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 12.4 acres.
When was it filed?
The application was filed on 11 Jan 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Jan 2024 |
| Application filed | 11 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Manish Kumar |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Tola Satighat |
| Taluk / tehsil | Jhajha |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00513 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 11 Jan 2024 (this page) | Environmental approval granted | 12.4 acres | ₹1.5 crore |
| Early planning filed 23 Nov 2023 | Cleared for impact study | 12.4 acres | ₹1.5 crore |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 12.4 acres, this one is smaller than 68% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Tola Satighat, Jhajha, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Bihar's ₹2,579 Crore Barnar Reservoir Project Advances Towards Implementation After Decades of Delay (7.5 km away).
Other projects nearby
- Transfer of Jamui Sand Ghat Ulai Block 04 Area 5.0 Hect Vill -Tola Satighat,… — environmental approval granted, 0 m away
- Sand Ghat Mining Project (Ulai River Block No. -04 Sand Ghat) of District-… — cleared for impact study, 0 m away
- Sand Ghat Mining Project (Ulai River Block No.- 02) at Riverbed of Ulai River — cleared for impact study, 900 m away
- Sand Ghat Mining Project (Ulai River Block No.- 02) at Riverbed of Ulai River — environmental approval granted, 900 m away
- Sand Ghat Mining Project (Ulai River Block No. -03) at Riverbed of Ulai River — environmental approval granted, 1.1 km away
- Sand Ghat Mining Project (Ulai River Block No. -03) at Riverbed of Ulai River — cleared for impact study, 1.1 km away
- Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed — lapsed, 2 km away
- Sand Ghat Mining Project (Ulai River Block No. -01 Sand Ghat) on Ulai River bed — lapsed, 2 km away
More from Manish Kumar in Jamui
- Sand Mining Project Jamui Barnar Block No.-04 Sand Ghat — environmental approval granted
- Sand Mining Project Jamui Barnar Block No.-04 Sand Ghat — cleared for impact study
- Sand Mining Project, Jamui Barnar-01 Sand Ghat of District- Jamui, State-Bihar. — environmental approval granted
- Sand Mining Project, Jamui Barnar-01 Sand Ghat of District- Jamui, State-Bihar. — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.