Quick answers
What is this project?
Proposed Sand Mining Project of Area 27 Ha at Bhojpur Ghat 1 on Sone River of District-Bhojpur State-Bihar is a proposed mining project in Mahui, Koilwar, Bhojpur, Bihar. The site covers 66.7 acres.
Who is building it?
The applicant is Nagendra Kumar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 21 Mar 2023), as of 27 Nov 2026.
Where is it?
In Mahui, Koilwar, Bhojpur, Bihar.
How big is it?
It has a stated cost of ₹8.3 crore and a site of 66.7 acres.
When was it filed?
The application was filed on 21 Mar 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 27 Ha at Bhojpur Ghat 1 on Sone River of…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 21 Mar 2023 |
| Application filed | 21 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Nagendra Kumar |
| Land area | 66.7 acres (27 ha) |
| Project cost | ₹8.3 crore |
| Village / locality | Mahui |
| Taluk / tehsil | Koilwar |
| District | Bhojpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00434 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Sept 2023 | Environmental approval granted | 66.7 acres | ₹8.3 crore |
| Early planning filed 21 Mar 2023 (this page) | Cleared for impact study | 66.7 acres | ₹8.3 crore |
In context
142 applications in Bhojpur since January 2022 are in the same category (Mining): 133 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 28 days from filing to approval. At 66.7 acres, this one is smaller than 57% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Mahui, Koilwar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 27 Ha at Bhojpur Ghat 01 on Sone River of… — environmental approval granted, 0 m away
- Proposed Sand Mining Project of Area 27 Ha at Bhojpur Ghat 1 on Sone River of… — environmental approval granted, 0 m away
- Proposed Sand Mining Project of Area 12 Ha at Bhojpur Ghat 2 on Sone River of… — cleared for impact study, 1.8 km away
- W/S work for 4 Lane to 6 Lane in KM 0.00 to 20.40 KM of Ara (NH-30) to… — lapsed, 2.8 km away
- Diversion of 0.02175 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 3.6 km away
- Diversion of 0.0165 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 3.7 km away
- Proposed Sand Mining Project of Area 34 Ha at Bhojpur Ghat 03 on Sone River of… — environmental approval granted, 4 km away
- Proposed Sand Mining Project of Area 34 Ha at Bhojpur Ghat 03 on Sone River of… — cleared for impact study, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.