Quick answers
What is this project?
Diversion of 0.0165 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Iocl on Khata No.- 346, 115, Khesra No.-335, 336, 337, Thana No.-112, Mauza-Rajapur, Thana-Koilwar to Koilwar-Chhapra Road is an approved fuel station in Rajapur, Koilwar, Bhojpur, Bihar. The site covers 0.5 acres.
Who is building it?
The applicant is Dilip Gupta.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 22 Sept 2025), as of 27 Nov 2026.
Where is it?
In Rajapur, Koilwar, Bhojpur, Bihar.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.5 acres and 170 m² of forest land.
When was it filed?
The application was filed on 16 Jan 2024.
Project details
| Official title | Diversion of 0.0165 Ha of Forest Land for Construction of Approach Road for Opening Retail Outlet of Iocl on Khata No.- 346, 115, Khesra No.-335, 336, 337, Thana No.-112, Mauza-Rajapur, Thana-Koilwar to Koilwar-Chhapra Road in Bhojpur District of Bihar. |
|---|---|
| Status | Forest land use approved |
| Status since | 22 Sept 2025 |
| Application filed | 16 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Dilip Gupta |
| Land area | 2,100 m² |
| Forest land | 170 m² |
| Project cost | ₹60 lakh |
| Village / locality | Rajapur |
| Taluk / tehsil | Koilwar |
| District | Bhojpur |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-03546 |
In context
28 applications in Bhojpur since January 2022 are in the same category (Fuel stations): 17 approved, 10 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.5 acres, this one is smaller than 54% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rajapur, Koilwar, Bhojpur, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.02175 Ha of Forest Land for Construction of Approach Road for… — forest land use approved, 150 m away
- Diversion of 0.0342 Ha of Forest Land for Construction of Approach Road for… — more information requested, 1.6 km away
- W/S work for 4 Lane to 6 Lane in KM 0.00 to 20.40 KM of Ara (NH-30) to… — lapsed, 1.7 km away
- Proposed Brick Earth Mining for M/S RAM BRICKS - Babura Soil Brick Mining… — environmental approval granted, 2.4 km away
- Proposed Sand Mining Project of Area 27 Ha at Bhojpur Ghat 01 on Sone River of… — environmental approval granted, 3.7 km away
- Proposed Sand Mining Project of Area 27 Ha at Bhojpur Ghat 1 on Sone River of… — environmental approval granted, 3.7 km away
- Proposed Sand Mining Project of Area 27 Ha at Bhojpur Ghat 1 on Sone River of… — cleared for impact study, 3.7 km away
- Proposed Sand Mining Project of Area 12 Ha at Bhojpur Ghat 2 on Sone River of… — cleared for impact study, 4.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.