Quick answers
What is this project?
Sand Ghat Mining Project (Jamui Kiul Block - 10) at Riverbed of Kiul River is a proposed mining project in Dobil, Khaira, Jamui, Bihar. The site covers 75.4 acres.
Who is building it?
The applicant is Shambhu Nath Choudhary.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Jan 2023), as of 27 Nov 2026.
Where is it?
In Dobil, Khaira, Jamui, Bihar.
How big is it?
It has a stated cost of ₹5.7 crore and a site of 75.4 acres.
When was it filed?
The application was filed on 23 Jan 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Jan 2023 |
| Application filed | 23 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shambhu Nath Choudhary |
| Land area | 75.4 acres (30.5 ha) |
| Project cost | ₹5.7 crore |
| Village / locality | Dobil |
| Taluk / tehsil | Khaira |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00472 |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 75.4 acres, this one is larger than 83% of them.
No other mining lease on record is within 500 m of this site; 21 have applied within 5 km.
Where it is
Dobil, Khaira, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Brick Earth Mining Project of M/s JCB Bricks at Mauza - Indape, Block… — environmental approval granted, 1.2 km away
- Brick Earth Mining for M/S Kamal Int Udyog-Singarpur Soil Brick Mining Project… — environmental approval granted, 1.5 km away
- Sand Mining Project, Jamui Kiul Block-09 Sand Ghat at Mauza- Chancho,… — environmental approval granted, 1.5 km away
- Sand Mining Project, Jamui Kiul Block-09 Sand Ghat at Mauza- Chancho,… — cleared for impact study, 1.5 km away
- Sand Mining Project, Jamui Barnar-16 Sand Ghat of District- Jamui, State-Bihar. — environmental approval granted, 1.8 km away
- Sand Mining Project, Jamui Barnar-16 Sand Ghat of District- Jamui, State-Bihar. — cleared for impact study, 1.8 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 11 Sand Ghat) at Riverbed of Kiul… — environmental approval granted, 2.4 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 11 Sand Ghat) at Riverbed of Kiul… — cleared for impact study, 2.4 km away
More from Shambhu Nath Choudhary in Jamui
- Sand Mining Project, Jamui Barnar-16 Sand Ghat of District- Jamui, State-Bihar. — environmental approval granted
- Sand Mining Project, Jamui Barnar-16 Sand Ghat of District- Jamui, State-Bihar. — cleared for impact study
- Sand Mining Project, Jamui Barnar-13 Sand Ghat of District- Jamui, State-Bihar. — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.