Quick answers
What is this project?
Sand Mining Project, Jamui Kiul Block-09 Sand Ghat at Mauza- Chancho, Chandabank, PS + Block - Khaira, Distt. – Jamui State-Bihar Area-16.70 Ha is a proposed mining project in Ballopur, Khaira, Jamui, Bihar. The site covers 41.3 acres.
Who is building it?
The applicant is Pintu Kumar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Jun 2026), as of 27 Nov 2026.
Where is it?
In Ballopur, Khaira, Jamui, Bihar.
How big is it?
It has a stated cost of ₹3 crore and a site of 41.3 acres.
When was it filed?
The application was filed on 1 Jun 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sand Mining Project, Jamui Kiul Block-09 Sand Ghat at Mauza- Chancho, Chandabank, PS +…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 Jun 2026 |
| Application filed | 1 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Pintu Kumar |
| Land area | 41.3 acres (16.7 ha) |
| Project cost | ₹3 crore |
| Village / locality | Ballopur |
| Taluk / tehsil | Khaira |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-02840 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Sept 2026 | Environmental approval granted | 41.3 acres | ₹3 crore |
| Early planning filed 1 Jun 2026 (this page) | Cleared for impact study | 41.3 acres | ₹3 crore |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 41.3 acres, this one is larger than 72% of them.
No other mining lease on record is within 500 m of this site; 18 have applied within 5 km.
Where it is
Ballopur, Khaira, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Mining Project, Jamui Kiul Block-09 Sand Ghat at Mauza- Chancho,… — environmental approval granted, 0 m away
- Brick Earth Mining for M/S Kamal Int Udyog-Singarpur Soil Brick Mining Project… — environmental approval granted, 800 m away
- Sand Mining Project, Jamui Barnar-16 Sand Ghat of District- Jamui, State-Bihar. — environmental approval granted, 900 m away
- Sand Mining Project, Jamui Barnar-16 Sand Ghat of District- Jamui, State-Bihar. — cleared for impact study, 900 m away
- Proposed Brick Earth Mining Project of M/s JCB Bricks at Mauza - Indape, Block… — environmental approval granted, 1.5 km away
- Sand Ghat Mining Project (Jamui Kiul Block - 10) at Riverbed of Kiul River — cleared for impact study, 1.5 km away
- Sand Mining Project, Jamui Barnar-15 Sand Ghat of District- Jamui, State-Bihar. — environmental approval granted, 2.2 km away
- Sand Mining Project, Jamui Barnar-15 Sand Ghat of District- Jamui, State-Bihar. — cleared for impact study, 2.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.