Quick answers
What is this project?
Proposed Brick Earth Mining Project of M/s JCB Bricks at Mauza - Indape, Block - Jamui, District - Jamui, Bihar (Area - 1.64 ha.) is an approved mining project in Nimrang, Jamui, Bihar. The site covers 4.1 acres.
Who is building it?
The applicant is Firoz Alam.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Jul 2025), as of 27 Nov 2026.
Where is it?
In Nimrang, Jamui, Bihar.
How big is it?
It has a stated cost of ₹9 lakh and a site of 4.1 acres.
When was it filed?
The application was filed on 11 Jun 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Jul 2025 |
| Application filed | 11 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Firoz Alam |
| Land area | 4.1 acres (1.6 ha) |
| Project cost | ₹9 lakh |
| Village / locality | Nimrang |
| Taluk / tehsil | Jamui |
| District | Jamui |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-01295 |
In context
145 applications in Jamui since January 2022 are in the same category (Mining): 137 approved, 6 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 4.1 acres, this one is smaller than 76% of them.
No other mining lease on record is within 500 m of this site; 14 have applied within 5 km.
Where it is
Nimrang, Jamui, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Brick Earth Mining for M/S Kamal Int Udyog-Singarpur Soil Brick Mining Project… — environmental approval granted, 900 m away
- Sand Ghat Mining Project (Jamui Kiul Block - 10) at Riverbed of Kiul River — cleared for impact study, 1.2 km away
- Proposed Brick Earth Mining Project of M/s R.N.S. Int Udyog at Mauza - Indpai,… — environmental approval granted, 1.3 km away
- Sand Mining Project, Jamui Kiul Block-09 Sand Ghat at Mauza- Chancho,… — environmental approval granted, 1.5 km away
- Sand Mining Project, Jamui Kiul Block-09 Sand Ghat at Mauza- Chancho,… — cleared for impact study, 1.5 km away
- Sand Mining Project, Jamui Barnar-16 Sand Ghat of District- Jamui, State-Bihar. — environmental approval granted, 2.3 km away
- Sand Mining Project, Jamui Barnar-16 Sand Ghat of District- Jamui, State-Bihar. — cleared for impact study, 2.3 km away
- Proposed Brick Earth Mining Project of M/s Rekha Devi Bricks at Mauza -… — environmental approval granted, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.