What is Developing? Open the mapMap

Cleared for impact studyMining · Gaya, Bihar

Proposed Sand Mining Project Sand Block No.-18 (Gaya Morhar-05) on Morhar River of District- Gaya, State- Bihar

Proposed Sand Mining Project Sand Block No.-18 (Gaya Morhar-05) on Morhar River of District- Gaya, State- Bihar is a proposed mining project in Sonbarsa, Paraiya, Gaya, Bihar. The site covers 37.1 acres. Its stated project cost is ₹10.7 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 1 Aug 2024).

See it on the live map All projects in Gaya

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Sand Mining Project Sand Block No.-18 (Gaya Morhar-05) on Morhar River of District- Gaya, State- Bihar is a proposed mining project in Sonbarsa, Paraiya, Gaya, Bihar. The site covers 37.1 acres.

Who is building it?

The applicant is Kunal Kumar.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 1 Aug 2024), as of 27 Nov 2026.

Where is it?

In Sonbarsa, Paraiya, Gaya, Bihar.

How big is it?

It has a stated cost of ₹10.7 crore and a site of 37.1 acres.

When was it filed?

The application was filed on 23 Jul 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project Sand Block No.-18 (Gaya Morhar-05) on Morhar River of…

Project details

StatusCleared for impact study
Status since1 Aug 2024
Application filed23 Jul 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantKunal Kumar
Land area37.1 acres (15 ha)
Project cost₹10.7 crore
Village / localitySonbarsa
Taluk / tehsilParaiya
DistrictGaya
StateBihar
Location fromSite boundary on record
Our referenceWID-BR-00648

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 12 Sept 2025Environmental approval granted37.1 acres₹10.7 crore
Early planning filed 23 Jul 2024 (this page)Cleared for impact study37.1 acres₹10.7 crore

In context

189 applications in Gaya since January 2022 are in the same category (Mining): 171 approved, 15 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 37.1 acres, this one is larger than 73% of them.

No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.

Where it is

Sonbarsa, Paraiya, Gaya, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.