Quick answers
What is this project?
Proposed Sand Mining Project of Area 32.0 Ha at Aurangabad Sone-16-A on Sone River of District - Aurangabad, State- Bihar is a proposed mining project in Kathaha, Barun, Aurangabad, Bihar. The site covers 79.1 acres.
Who is building it?
The applicant is Abhishek Kumar.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 15 Apr 2024), as of 27 Nov 2026.
Where is it?
In Kathaha, Barun, Aurangabad, Bihar.
How big is it?
It has a stated cost of ₹9.8 crore and a site of 79.1 acres.
When was it filed?
The application was filed on 6 Apr 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Sand Mining Project of Area 32.0 Ha at Aurangabad Sone-16-A on Sone River of…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 15 Apr 2024 |
| Application filed | 6 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Abhishek Kumar |
| Land area | 79.1 acres (32 ha) |
| Project cost | ₹9.8 crore |
| Village / locality | Kathaha |
| Taluk / tehsil | Barun |
| District | Aurangabad |
| State | Bihar |
| Location from | Site boundary on record |
| Our reference | WID-BR-00691 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Jul 2024 | Environmental approval granted | 79.1 acres | ₹9.8 crore |
| Early planning filed 6 Apr 2024 (this page) | Cleared for impact study | 79.1 acres | ₹9.8 crore |
In context
145 applications in Aurangabad since January 2022 are in the same category (Mining): 127 approved, 13 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 33 days from filing to approval. At 79.1 acres, this one is larger than 66% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 396.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 27 mining leases have applied within 5 km.
Where it is
Kathaha, Barun, Aurangabad, Bihar. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Sand Mining Project of Area 32.0 Ha at Aurangabad Sone-16-A on Sone… — environmental approval granted, 0 m away
- Proposed Sand Mining Project of Area 32.40 Ha at Aurangabad Sone- 15C Sand… — under environmental review, 250 m away
- Proposed Sand Mining Project of Area 32.40 Ha at Aurangabad Sone- 15C Sand… — cleared for impact study, 250 m away
- Proposed Sand Mining Project Aurangabad Sone-16-B on Sone River of District-… — cleared for impact study, 250 m away
- Proposed Sand Mining Project Aurangabad Sone- 15-B on Sone River of District-… — under environmental review, 500 m away
- Proposed Sand Mining Project Aurangabad Sone- 15-B on Sone River of District-… — under environmental review, 500 m away
- Proposed Sand Mining Project Aurangabad Sone- 16-C on Sone River of District-… — environmental approval granted, 500 m away
- Proposed Sand Mining Project Aurangabad Sone- 16-C on Sone River of District-… — cleared for impact study, 500 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.